Laserfiche WebLink
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: TUC/TOD Pedestrian Improvements Project No. 90710405 <br />DESCRIPTION: Construct bike/pedestrian connection in phases between the Tukwila Urban Center (TUC) Transit Center <br />and Tukwila Station in the Southcenter area's Transit Oriented Development (TOD) district. <br />Connecting the TUC to the Tukwila Longacres Station is needed to increase pedestrian mobility, improve <br />JUSTIFICATION: access, and support more urban levels of development within walking distance of Tukwila Station. The <br />connection involves a pedestrian path extending from Baker Blvd via the planned TUC Pedestrian Bridge and a <br />pedestrian tunnel under the UPRR track embankment. Additional phases will extend the corridor to the mall. <br />STATUS: See Tukwila Urban Center - Pedestrian/Bicycle Bridge, West Valley Hwy Non -Motorized and Baker Blvd Non- <br />MAINT. IMPACT: <br />Motorized CIP pages. Funding shown in beyond is for construction of the UPRR underpass (in 2016 $). <br />COMMENT: Mitigation listed is $20k from Sound Transit for pedestrian underpass of the UPRR tracks. <br />FINANCIAL Through Estimated <br />in $000's <br />2015 2016 2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />2022 <br />BEYOND TOTAL <br />EXPENSES <br />Design <br />20 <br />660 <br />680 <br />Land (RM/) <br />0 <br />Const. Mgmt. <br />440 <br />440 <br />Construction <br />3,150 <br />3,150 <br />TOTAL EXPENSES <br />0 <br />0 <br />20 <br />0 <br />0 <br />0 <br />0 <br />0 <br />4,250 <br />4,270 <br />FUND SOURCES <br />Proposed Grant <br />3,400 <br />3,400 <br />ST Mitigation <br />20 <br />20 <br />KCDNR Trail Levy 1 <br />0 <br />Traffic Impact Fees <br />0 <br />City Oper. Revenue <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />850 <br />850 <br />TOTAL SOURCES <br />0 <br />0 <br />20 <br />0 <br />0 <br />0 <br />0 <br />0 <br />4,250 <br />4,270 <br />111111111111111111111 <br />11111111111111 <br />2017 - 2022 Capital Improvement Program <br />25 <br />24 <br />