City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-05-14 Item 2A - Agreement - Strander Boulevard Extension Phase III: Utility Relocation Design Reimbursement with BP / Olympic Pipeline for $630,000
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-05-14 Transportation and Infrastructure
>
TIC 2018-05-14 Item 2A - Agreement - Strander Boulevard Extension Phase III: Utility Relocation Design Reimbursement with BP / Olympic Pipeline for $630,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:59 PM
Creation date
5/9/2018 4:35:55 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/14/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section I <br />OPL with its regular personnel at its standard schedule of wages and working hours, or <br />by a contractor or subcontractor, will perform the necessary activities as outlined in the scope of <br />work document being Exhibit "A" (the "Work") attached hereto and made a part hereof. The <br />preliminary estimated cost of the Work is Six Hundred Thirty Thousand Dollars ($630,000.00) as <br />set forth in attached Exhibit "B" ("Estimated Cost"). <br />Section II <br />a) CITY shall pay any and all actual costs and expenses incurred by or on behalf of OPL in <br />connection with performance of the Work (the "Actual Cost"). Monthly, OPL will submit a <br />reimbursement request to the City that describes the work performed and the cost. The City will <br />pay OPL within 30 days of receipt of the request. <br />Section III <br />OPL shall perform the Work as defined and outlined in Exhibit "A". <br />Section IV <br />OPL shall have no obligation to start the Work until written notice has been provided by <br />CITY that the Work has been agreed to, approved by and authorized by CITY, a satisfactory <br />starting date has been mutually agreed upon by both CITY and OPL, and the Estimated Cost <br />has been paid. Prior to starting the Work, CITY shall cooperate with OPL in obtaining or <br />causing to be obtained, in a form acceptable to OPL, any right, permit, permission, easement <br />and access rights, at the sole cost and expense of CITY, required for OPL to perform the <br />WORK and CITY shall, if requested by OPL, survey and stake all easements and access rights <br />that pertain to the Work. <br />Section V <br />2 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.