Laserfiche WebLink
oto <br />igh <br />City of Tukwila <br />Public Works Department - Henry Hash, Director <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation and Infrastructure Committee <br />FROM: Henry Hash, Public Works Director i4 <br />BY: Ryan Larson, Senior Program Manager <br />CC: Mayor Allan Ekberg <br />DATE: May 11, 2018 <br />SUBJECT: 53rd Ave South - S 137th St to S 144th St <br />Project No. 99410301 <br />Memorandum of Agreement with Seattle City Light/City of Seattle <br />Allan Ekberg, Mayor <br />ISSUE <br />Enter into an agreement with Seattle City Light/City of Seattle (SCL) for the construction cost sharing to underground <br />the electrical distribution system as part of the 53rd Ave S Project. <br />BACKGROUND <br />The 53rd Ave S Project will construct roadway, drainage, sidewalks, illumination, water and sewer upgrades, and <br />undergrounding of overhead utilities between South 137th Street and South 144th Street. The project design team <br />worked with utility providers including Seattle City Light to incorporate their system requirements and design into <br />the City's project. Negotiations between staff and SCL resulted in the attached Memorandum of Agreement (MOA) <br />to cost share the undergrounding portion of the 53rd Ave S Project. <br />ANALYSIS <br />The costs to underground the electrical distribution system is proposed to be split; SCL will be responsible for 60% <br />of the cost and Tukwila responsible for 40%. Costs for the aerial conversion are divided into two distinct types of <br />work: civil Infrastructure costs and Underground Electrical System (UES) costs. Civil costs cover the work to install <br />the physical infrastructure (e.g. vaults and conduit) while UES costs are for the work and materials to pull the cabling <br />through the infrastructure and connect and energize the new system. <br />Agency Civil Cost UES Costs Total <br />SCL (60%) $ 412,823.40 $444,600.00 $857,423.40 <br />Tukwila (40%) 275,215.60 296,400.00 571,615.60 <br />Total $ 688,039.00 $741,000.00 $1.429.039.00 <br />The costs above reflect the MOA language and the results from the actual contractor's bid. The final costs will be <br />adjusted to reflect actual costs incurred during construction, but the share will be split with the 60%/40% cost share <br />ratio. <br />FINANCIAL IMPACT <br />The total cost for underground is $1,429,039.00. Tukwila's share to underground the electrical system under this <br />MOA is anticipated to be $571,615.60 based on the bid proposal and the UES costs projected by SCL. The <br />anticipated reimbursement amount from SCL is $857,423.40. The cost sharing with SCL does not include all costs <br />for the aerial conversion, only those specifically identified in the MOA as shared costs. Trenching and backfill costs <br />within the right-of-way and all conversion work on private property are examples of work to be performed entirely <br />at the City's expense and not part of this SCL MOA. <br />RECOMMENDATION <br />Council is being asked to authorize the Mayor to execute the Memorandum of Agreement with Seattle City Light for <br />the 53rd Ave S Project and consider this item on the Consent Agenda at the May 21, 2018 Regular Meeting. <br />Attachments: Memorandum of Agreement by and between the City of Seattle and City of Tukwila <br />Page 3, 2017 CIP <br />19 <br />W: PW EngIPROJECTSIA- RW 8 RS Projects153rd Ave S (90110301)1ConstructonlInfo Memo SCL MOA 051118 gl.docx <br />