City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-05-14 Item 2D - Agreement - Memorandum of Agreement with Seattle City Light / City of Seattle for Underground Electrical Distribution System Cost Sharing (53rd Avenue South Project)
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-05-14 Transportation and Infrastructure
>
TIC 2018-05-14 Item 2D - Agreement - Memorandum of Agreement with Seattle City Light / City of Seattle for Underground Electrical Distribution System Cost Sharing (53rd Avenue South Project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:00 PM
Creation date
5/9/2018 4:36:27 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/14/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
inform the bidders of these considerations. Tukwila and City Light will coordinate and <br />cooperate to avoid unnecessary delays in the review and approval of change orders related <br />to the Work made necessary to adjust design, schedules, and costs as outlined in this <br />Agreement. Notwithstanding any provision in this Agreement, the Franchise, PS&E or <br />the City Light Civil Infrastructure Engineering Guidelines, City Light will have no <br />independent authority to give direction to, or exercise control over, any of the City's <br />Contractors or subcontractors, or their agents or employees, or to independently approve <br />changes orders, issue field directives, or alter approved Civil Infrastructure Plans and <br />Specifications. <br />1.6 Delay: Tukwila and City Light will work cooperatively to bring the Work to completion <br />on schedule and within budget and to avoid disruption or delay to the City's contractor and <br />its subcontractors. The Parties will be responsive to schedule and cost concerns and will <br />commit sufficient resources to support the Work and will work cooperatively to resolve <br />any unanticipated design and construction issues related to the Work as they may develop. <br />1.7 Civil Infrastructure: Tukwila will include the Civil Infrastructure (as defined in Section 2) <br />as a separate Schedule to its construction bid documents, a copy of which is attached hereto <br />as Exhibit A, Schedule C. Tukwila will construct all City Light Civil Infrastructure and <br />Private Property Civil Infrastructure. <br />1.8 Underground Electrical System: City Light will perform the installation of its electrical <br />facilities and equipment (Underground Electrical System as defined in Section 2) within <br />the completed Civil Infrastructure. Tukwila shall, with the assistance of City Light, be <br />responsible for coordinating with the private property owners for the portion of the Work <br />to be performed on private property (the "Private Property Infrastructure Work"). (See <br />also Section 6 Construction.) In the event that a private property owner refuses the <br />undergrounding of their service or is otherwise delayed, City Light may, at the request of <br />the City Tukwila, place a pole and route conduit to pole as necessary to maintain electric <br />service to a City Light customer or customers. Such work shall be at Tukwila's request <br />and expense. <br />1.9 Hard Surface Removal and Restoration Costs: Hard surface removal and restoration within <br />City Light trenching and vault excavation limits of Schedule C work shall be Tukwila's <br />responsibility. A hard surface similar to existing conditions within said construction limits <br />will be required until such time that repaving, resurfacing and installing new sidewalks as <br />a component of the overall Project improvements is to occur. City Light shall promptly <br />notify Tukwila if City Light discovers a need for hard surface removal and restoration <br />outside the limits of Schedule C work area, so that appropriate change orders to the Project <br />contract can be made to complete such work. <br />1.10 Sequencing of Conversion Work: City Light's most efficient sequencing for overhead to <br />underground relocation and installation work such as this Project is to begin electrical work <br />only after all Civil Infrastructure design and construction is completed and accepted. In the <br />event the Civil Infrastructure work is substantially complete before the date City Light is <br />to begin its electrical infrastructure installation work (the "Electrical Work") in accordance <br />City of Tukwila — 53rd Ave S Undergrounding Agreement <br />Page 3 of 17 <br />FINAL <br />