"Contractor": Selected contractor from Tukwila's Project bidding process. Selected <br />contractor is responsible for all Project work, including but not limited to excavation, <br />construction and all subcontracted work, except for the Electrical Work related to the <br />Underground Electrical System. <br />"Conversion Area": The 53rd Avenue S corridor in Tukwila, Washington from S 137th <br />Street to S 144th Street, including parcels served by the electrical distribution system along <br />this corridor. <br />"Electrical Work": The installation of the Underground Electrical System within the <br />completed Civil Infrastructure following Operational Acceptance by City Light. <br />"Field Directive Change(s)": Design changes to agreed-upon "Work" as the result of field <br />conditions. <br />"Final Acceptance": The determination by City Light after all Schedule C work has been <br />completed, including having all vault and hand hold lids brought to grade and completion <br />of all punch list work related to the Civil Infrastructure, that the Civil Infrastructure is in <br />conformance with the approved plans and specifications for the Project. Final Acceptance <br />shall also be dependent upon the receipt and approval of as -built drawings for the Civil <br />Infrastructure by City Light. Final Acceptance shall be in the form of a letter to Tukwila's <br />City Engineer or another designated representative. <br />"Operational Acceptance": The determination by City Light that the Civil Infrastructure is <br />in material and substantial conformance with the approved plans and specifications for the <br />Project and is ready for installation of the Underground Electrical System by City Light. <br />"Primary Project Costs": All costs associated with the Project for providing the path for <br />the utility infrastructure, including, but not limited to design, project management and <br />construction management, trench and vault excavation and backfill, and repaving, <br />resurfacing, installation and restoration of hard surfaces, including all labor, materials, <br />tools, and equipment. Primary Project costs shall be the responsibility of Tukwila and not <br />the responsibility of City Light. <br />"Private Property Infrastructure": The underground infrastructure, including the service <br />lines to be located on private property that is necessary for City Light to complete an <br />underground service connection to the private property. Private Property Infrastructure is <br />not the responsibility of City Light. <br />"Private Property Infrastructure Work": The work that is necessary to design, construct <br />and install the Private Property Infrastructure to enable City Light to complete the service <br />connections at the "point of service termination point". Such work shall include any and <br />all of the electrical underground work on each private property, including but not <br />limited to: connections between the old overhead service at the weatherhead and the <br />new underground cable, pulling the underground cable to a "point of service termination <br />point" in the ROW or utility easement, and providing a secondary handhold at the point <br />of service termination point. <br />City of Tukwila — 53rd Ave S Undergrounding Agreement <br />Page 5 of 17 <br />FINAL <br />24 <br />