City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-05-14 Item 2E - Contract Supplement #1 - 42nd Avenue South Phase III / Gilliam Culvert Replacement Construction Management with AECOM Technical Services
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-05-14 Transportation and Infrastructure
>
TIC 2018-05-14 Item 2E - Contract Supplement #1 - 42nd Avenue South Phase III / Gilliam Culvert Replacement Construction Management with AECOM Technical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:00 PM
Creation date
5/9/2018 4:36:38 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/14/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />STATUS: <br />MAINT. IMPACT: <br />COMMENT: <br />CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />42nd Ave South Phase III Project No. 99410303 <br />Design and construct street improvements, drainage, sidewalks, bike facilities, and driveway adjustments. <br />Provide pedestrian and vehicle safety, drainage, and neighborhood revitalization. <br />Phase Ill (S/C Blvd (154th) - S 160 St), Design began in 2012, construction in 2017. Project No. 99410303 <br />Phase IV (S 139 St - S 131 PI) in beyond. Project No. 99410301 <br />Phase I 90-RW15 (S/C Blvd (154) - 144 St) $3,796 & Phase II 94-RS02 (144-139) $1,850, both completed. <br />Reduce pavement, shoulder, and drainage work. <br />Only Phase III is shown in active years. Project includes Surface Water's Gilliam Creek 42nd Ave S Culvert project <br />for $1.3m and is part of the Walk & Roll Plan. Seattle City Light's funding is a 60/40 underground split. <br />FINANCIAL Through Estimated <br />(in $000's) 2015 2016 <br />2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />2022 <br />BEYOND TOTAL <br />EXPENSES <br />Phase IV <br />Design <br />1,000 <br />125 <br />1,125 <br />Land (R/W) <br />100 <br />100 <br />Const. Mgmt. <br />750 <br />322 <br />560 <br />1,632 <br />Construction <br />2,534 <br />1,086 <br />3,800 <br />7,420 <br />Undergrounding <br />2,467 <br />1,057 <br />3,524 <br />TOTAL EXPENSES <br />1,000 <br />125 <br />5,851 <br />2,465 <br />0 <br />0 <br />0 <br />0 <br />4,360 <br />13,801 <br />FUND SOURCES <br />Seattle City Light <br />1,077 <br />462 <br />1,539 <br />Surface Water <br />144 <br />4 <br />148 <br />Other Utilities <br />1 <br />150 <br />136 <br />287 <br />Bond <br />4,600 <br />1,800 <br />6,400 <br />City Oper. Revenue <br />855 <br />121 <br />24 <br />67 <br />0 <br />0 <br />0 <br />0 <br />4,360 <br />5,427 <br />TOTAL SOURCES <br />1,000 <br />125 <br />5,851 <br />2,465 <br />0 <br />0 <br />0 <br />0 <br />4,360 <br />13,801 <br />Project Location <br />2017 - 2022 Capital Improvement Program <br />2 <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.