City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-05-14 Item 2E - Contract Supplement #1 - 42nd Avenue South Phase III / Gilliam Culvert Replacement Construction Management with AECOM Technical Services
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-05-14 Transportation and Infrastructure
>
TIC 2018-05-14 Item 2E - Contract Supplement #1 - 42nd Avenue South Phase III / Gilliam Culvert Replacement Construction Management with AECOM Technical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:00 PM
Creation date
5/9/2018 4:36:38 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/14/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila Agreement Number: <br />6200 Southcenter Boulevard, Tukwila WA 98188 <br />CONTRACT FOR SERVICES <br />Amendment #1 <br />Between the City of Tukwila and AECOM Technical Services, Inc. <br />That portion of Contract No. 17-085 between the City of Tukwila and AECOM Technical <br />Services, Inc. is hereby amended as follows: <br />Section 2, "Scope of Services": <br />Additional consultant contract scope includes an estimated 4 months of construction <br />management (CM) time for the 40th -42nd Avenue South Phase III project, due to various <br />changes on the construction project. Therefore, extended construction support; additional <br />inspection and office engineering resources are required to handle numerous differing site <br />conditions from the design, unforeseen issues, force account tracking and processing <br />beyond the original scope, extensive change orders, and other CM items. <br />This budget assumes that third party utilities will complete the cutover work within a 3 - <br />month window, thereby reducing the project shutdown period. <br />Section 4, "Payment": <br />The Contract is revised to add $791,270.00 as shown on Exhibit "B" attached hereto. The <br />new total Contract amount is $1,768,424.00. <br />All other provisions of the contract shall remain in full force and effect. <br />Dated this <br />CITY OF TUKWILA <br />day of , 20 <br />Allan Ekberg, Mayor <br />CONTRACTOR <br />%i <br />Printed Name: <br />ATTEST/AUTHENTICATED APPROVED AS TO FORM <br />Christy O'Flaherty, MMC, City Clerk Office of the City Attorney <br />CA Revised December 2016 <br />Page 1 of 1 <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.