City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-05-14 Item 2E - Contract Supplement #1 - 42nd Avenue South Phase III / Gilliam Culvert Replacement Construction Management with AECOM Technical Services
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-05-14 Transportation and Infrastructure
>
TIC 2018-05-14 Item 2E - Contract Supplement #1 - 42nd Avenue South Phase III / Gilliam Culvert Replacement Construction Management with AECOM Technical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:00 PM
Creation date
5/9/2018 4:36:38 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/14/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit B <br />,AOM <br />City of Tukwila <br />BUDGET FOR SERVICES <br />40th - 42nd Avenue South - Phase III <br />Construction Inspection and Administration Services <br />Task 5: Public Outreach <br />Employee Classification Hours Rate Cost (DSC) <br />Paki Perala Construction Manager 40 $ 68.00 $ 2,720 <br />40 $ 2,720 <br />Overhead (OH Cost -- Including Salary Additives): <br />OH Rate x DSC of 119.67% x $ 2,720.00 $ 3,255 <br />Fee: <br />Fee Rate x DSC of 30.00% x $ 2,720.00 $ 816 <br />Labor Subtotal -Public Outreach <br />$ 6,791 <br />Task 6: Change Orders <br />Employee Classification Hours Rate Cost (DSC) <br />Paki Perala Resident Engineer 80 $ 68.00 $ 5,440 <br />Jamie Shinsato Office Engineer 160 $ 36.00 $ 5,760 <br />240 $ 11,200 <br />OH Rate x DSC of 119.67% x $ 11,200.00 $ 13,403 <br />Fee: <br />Fee Rate x DSC of 30.00% x $ 11,200.00 $ 3,360 <br />Labor Subtotal - Change Orders $ 27,963 <br />Task 7: Electronic As-Builts <br />Employee Classification Hours Rate Cost (DSC) <br />TBD CAD Operator 80 $ 30.00 $ 2,400 <br />80 $ 2,400 <br />Overhead (OH Cost -- Including Salary Additives): <br />OH Rate x DSC of 149.10% <br />Fee Rate x DSC of 30.00% <br />Labor Subtotal - Electronic As-Builts <br />Fee: <br />Task 800: Materials Testing <br />Materials Testing & Consulting, Inc. <br />Task 900: Other Direct Costs <br />Vehicles ($6/hr for field work, tasks 3, 4, 5, & 6) <br />Printer/Scanner (estimate $150/mo for 13 months) <br />Expenses (Misc Supplies) <br />x $ 2,400.00 $ 3,578 <br />x $ 2,400.00 $ 720 <br />$ 6,698 <br />Labor Total $ 748,030 <br />Cost <br />$ 24,084 <br />$ 24,084 <br />Hours Rate <br />3,026 $ 6.00 $ <br />$ <br />Cost <br />18,156 <br />600 <br />400 <br />19,156 <br />Direct Costs Total $ 43,240 <br />Grand Total $ 791,270 <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.