City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-05-29 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-05-29 Transportation and Infrastructure
>
TIC 2018-05-29 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:00 PM
Creation date
5/23/2018 2:58:10 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/29/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2018 to 2023 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />Hearing <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />16 <br />STP(UL) <br />TUK-59 <br />Strander Blvd./SW 27th St Extension <br />Strander Blvd./SW 27th St <br />West Valley Highway to Naches Ave <br />This project is Phase 3 of a multi -phase improvement that will connect Strander <br />Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in <br />Renton. This project will complete the design, right-of-way and construction phases <br />for the roadway segment between West Valley Hwy and Naches Ave. Project <br />components include a railroad bridge for the Union Pacific RR to provide grade <br />separation. a new 4/5 lane roadway segment east of West Valley Hwy. roadway <br />widening of two lanes for a portion of the project segment, a separated joint -use trail, <br />a new trail bridge for the Interurban Trail (including new trail connections to Strander <br />Blvd.), a new flyover bridge connection to the Tukwila Station, and a new traffic <br />signal serving the Tukwila Station. Current funding will complete the preliminary <br />engineering and right-of-way phases. Construction will be funded as part of a future <br />phase. <br />06/12/17 <br />06/19/17 <br />607,500 <br />4,500,000 <br />01 <br />RW <br />0.300 <br />DCE <br />Yes <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />PE <br />2018 <br />STP(UL) <br />3,892,500 <br />0 <br />607,500 <br />4,500,000 <br />S <br />RW <br />2018 <br />STP(UL) <br />1,254,300 <br />0 <br />195,700 <br />1,450,000 <br />P <br />CN <br />2020 <br />TIGER <br />13,794,000 <br />TIB <br />5,000,000 <br />706,000 <br />19,500,000 <br />P <br />CN <br />2020 <br />FMSIB <br />5,000,000 <br />0 <br />0 <br />5,000,000 <br />S <br />CN <br />2020 <br />Discretionary <br />5,000,000 <br />0 <br />0 <br />5,000,000 <br />P <br />CN <br />2020 <br />0 <br />0 <br />706,000 <br />706,000 <br />Totals <br />28,940,800 <br />5,000,000 <br />2,215,200 <br />36,156,000 <br />Report Date: May 24, 2017 <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.