Laserfiche WebLink
Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />Hearing <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />17 <br />SRTS <br />WA03782 <br />S 144th St Bridge Sidewalks <br />S 144th Street <br />51st Ave S to 53rd Ave S <br />Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S <br />06/12/17 <br />06/19/17 <br />27,000 <br />200,000 <br />28 <br />CN <br />0.250 <br />SRTS <br />No <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2019 <br />SRTS <br />173,000 <br />1210,000 <br />0 <br />27,000 <br />200,000 <br />P <br />CN <br />2019 <br />SRTS <br />1,047,000 <br />0 <br />0 <br />163,000 <br />1,210,000 <br />Totals <br />1,220,000 <br />0 <br />190,000 <br />1,410,000 <br />Expenditure Schedule <br />Phase <br />1st <br />2nd <br />3rd <br />4th <br />5th & 6th <br />PE <br />200,000 <br />0 <br />0 <br />0 <br />0 <br />CN <br />0 <br />1210,000 <br />0 <br />0 <br />0 <br />Totals <br />200,000 <br />1,210,000 <br />0 <br />0 <br />0 <br />Report Date: May 17, 2018 <br />Page 15 <br />