Laserfiche WebLink
Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />Hearing <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />16 <br />STP(UL) <br />I 1276(007) TUK-59 <br />Strander Blvd./SW 27th St Extension <br />Strander Blvd./SW 27th St Extension <br />West Valley Highway to Naches Ave <br />This project is Phase 3 of a multi -phase improvement that will connect Strander <br />Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in <br />Renton. This project will complete the design, right-of-way and construction phases <br />for the roadway segment between West Valley Hwy and Naches Ave. Project <br />components include a railroad bridge for the Union Pacific RR to provide grade <br />separation, a new 415 lane roadway segment east of West Valley Hwy. roadway <br />widening of two lanes for a portion of the project segment, a separated joint -use trail, <br />a new trail bridge for the Interurban Trail (including new trail connections to Strander <br />Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal <br />serving the Tukwila Station, and storm drainage facilities. Current funding will <br />complete the preliminary engineering and rightof- way phases. Construction will be <br />funded as part of a future phase. <br />06/25/18 <br />07/02/18 <br />607.500 <br />4.500.000 <br />01 <br />RW <br />0.300 <br />DCE <br />Yes <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />PE <br />2019 <br />STP(UL) <br />3,892 500 <br />0 <br />607.500 <br />4.500.000 <br />S <br />RW <br />2020 <br />STP(UL) <br />1.254.250 <br />ALL <br />0 <br />195.750 <br />1.450.000 <br />Totals <br />5,146,750 <br />0 <br />803,250 <br />5,950,000 <br />Expenditure Schedule <br />Phase <br />1st <br />2nd <br />3rd <br />4th <br />5th & 6th <br />PE <br />4,500,000 <br />0 <br />0 <br />0 <br />0 <br />ALL <br />0 <br />1,450,000 <br />0 <br />0 <br />0 <br />Totals <br />4,500,000 <br />1,450,000 <br />0 <br />0 <br />0 <br />N <br />n' Report Date: May 17, 2018 <br />Page 18 <br />