Laserfiche WebLink
Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2018 to 2023 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />Hearing <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />00 <br />SRTS <br />I 1320(005) TUK-58 <br />Cascade View Elementary Safe Routes to School Project - Phase 2 <br />33rd Ave S and S 140th Street <br />S. 144th at 34th Ave. S. to 140th St at 34th Ave. S. <br />Concrete sidewalks are proposed on one side of 33rd Ave S (S 140th St to S 144th <br />St) and on one side of S. 140th St (Military Road South to 34th Ave 5) along with a <br />standard curb and gutter separating the sidewalk from the roadway. A traffic circle is <br />proposed at the intersection of 33rd Ave S and S 140th St to assist in reducing <br />vehicle speeds and increase visibility and safety of pedestrians crossing the street. <br />Curb bulb -outs and/or pedestrian refuge islands at the east entrance/exit to the traffic <br />circle would be constructed to improve the safety of crossing S 140th St at 33rd Ave <br />S. There are currently no ADA facilities to connect to within the project limits. Minor <br />storm water improvements will be added to the general action area. The new <br />sidewalk along 33rd Ave S. will require reconstruction of the pavement cross section <br />to establish proper crown slopes. <br />06/12/17 <br />06/19/17 <br />100,000 <br />814,000 <br />28 <br />714,000 <br />0.510 <br />CE <br />No <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />CN <br />2018 <br />SRTS <br />714,000 <br />0 <br />100,000 <br />814,000 <br />Totals <br />714,000 <br />814,000 <br />0 <br />100,000 <br />814,000 <br />Expenditure Schedule <br />Phase <br />1st <br />2nd <br />3rd <br />4th <br />5th & 6th <br />ALL <br />814,000 <br />0 <br />0 <br />0 <br />0 <br />Totals <br />814,000 <br />0 <br />0 <br />0 <br />0 <br />cn <br />"n Report Date: May 24, 2017 <br />Page 9 <br />