City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-06-25 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-06-25 Transportation and Infrastructure
>
TIC 2018-06-25 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:01 PM
Creation date
6/21/2018 12:43:53 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/25/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
Document Relationships
TIC 2018-05-29 Item 4B - Discussion - Handout Distributed at Meeting - Crosswalks and Stop Signs Guidelines
(Attachment)
Path:
\City Clerk\Council Committees\Transportation and Infrastructure (2017-2020)\Transportation and Infrastructure Agenda Packets (2017-Present)\2018-05-29 Transportation and Infrastructure
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2019 to 2024 <br />PROJECT: West Valley Hwy (1-405 - Strander Blvd) Project No. 99310410 <br />Design and construct completion of 7 lane sections of West Valley Hwy with curbs, gutters, storm drainage, <br />DESCRIPTION: lighting and traffic control, including a ped -activated signal near new Ped Bridge. Shared use path on west side <br />of WVH from Ped Bridge to Longacres to be constructed. Design of non -motorized facilities on Longacres from <br />WVH to end of ROW included. <br />JUSTIFICATION: Safety andcapacityitems needcompletion. Portions have been comp?ted by development. <br />Combined with W Valley Hwv/S 156th IntersPptiorl„. 2r � � . �' .� i f o work with development.Grant funding <br />STATUS: in hand for design and cc <br />yet. <br />MAINT. IMPACT: Reduced maintenance. <br />COMMENT: <br />struction on Longacres Way identified <br />Project is on Traffic Impact Fee List. Grants from Federal CMAQ awarded for $628k that includes $112k for <br />design of sidewalk/bike path on Longacres Way (S 158th St) and State Transportation Improvement <br />Board grant of $2.4m for 2018/2019. <br />FINANCIAL Through Estimated <br />in $000's) <br />2017 2018 2019 <br />2020 2021 2022 2023 2024 BEYOND TOTAL <br />EXPENSES <br />Design <br />16 <br />60 <br />472 <br />548 <br />Land(R/W) <br />100 <br />100 <br />Const. Mgmt. <br />430 <br />430 <br />Construction <br />2,765 <br />2,765 <br />TOTAL EXPENSES <br />16 <br />60 <br />572 <br />3,195 <br />0 <br />0 <br />0 <br />0 <br />0 <br />3,843 <br />FUND SOURCES <br />Awarded TIB Grant <br />58 <br />350 <br />2,026 <br />2,434 <br />Awarded CMAQ Grant <br />187 <br />441 <br />628 <br />Mitigation <br />0 <br />Traffic Impact Fees <br />37 <br />213 <br />250 <br />City Oper. Revenue <br />16 <br />2 <br />(2) <br />515 <br />0 <br />0 <br />0 <br />0 <br />0 <br />531 <br />TOTAL SOURCES <br />16 <br />60 <br />572 <br />3,195 <br />0 <br />0 <br />0 <br />0 <br />0 <br />3,843 <br />Project Location <br />2019 - 2024 Capital Improvement Program <br />21 <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.