City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-06-25 Item 2A - Grant Acceptance - Congestion Mitigation and Air Quality Grant for West Valley Highway (I-405 to Strander Boulevard)
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-06-25 Transportation and Infrastructure
>
TIC 2018-06-25 Item 2A - Grant Acceptance - Congestion Mitigation and Air Quality Grant for West Valley Highway (I-405 to Strander Boulevard)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:01 PM
Creation date
6/21/2018 12:54:30 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/25/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Description of Proposed Work <br />Improvements will be completed on SR 181 from the west end of the planned Green River non - <br />motorized Bridge to Longacres Way, including a 12-14 ft. separated shared use path with a 5 ft. <br />landscaped buffer strip on the west side of the highway. Design -only will be completed for future <br />improvements on Longacres Way between SR 181 to the Tukwila Sound Transit Link Station. <br />Engineer's Estimate for Proposed Work <br />Within the attachment entitled "Tukwila Mobility Connections" are descriptions of the proposed <br />work and engineering estimates of probably cost. The work is part of a larger effort to improve <br />mobility connections and this document includes discussion on improvements to Baker Boulevard. <br />That segment has been funded outside of the CMAQ grant and is complete. The Engineer's <br />Estimate 2 on page 17 is the basis for the cost estimate. PE costs were estimated using 15% of the <br />construction estimate. Page 21, Estimate 2 is the basis for the PE costs, also using 15% of the <br />construction cost ($749,062.50). <br />Phase <br />West Valley Highway <br />Longacres Way <br />PE (rounded) <br />$72,300 <br />$112,500 <br />CN (rounded) <br />$482,000 <br />n/a <br />Total <br />$554,300 <br />$112,500 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.