Laserfiche WebLink
Washington State <br />Department of Transportation <br />Agency City of Tukwila <br />Address <br />6200 Southcenter Boulevard <br />Tukwila, WA 98188 <br />Local Agency Agreement <br />CFDA No. 20.205 <br />(Catalog or Federal Domestic Assistance) <br />Project No. TUK-60 <br />Agreement No. <br />For OSC WSDOT Use Only <br />The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code <br />Highways, (2) the regulations issued pursuant thereto, (3) 2 CFR Part 200, (4) the policies and procedures promulgated by the <br />Washington State Department of Transportation, and (5) the federal aid project agreement entered into between the State and Federal <br />Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to <br />proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount <br />shown herein on line r, column 3, without written authority by the State, subject to the approval of the Federal Highway Administration. <br />All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency. <br />Project Description <br />Name West Valley Highway/Longacres Way Shared Use Pathways <br />Termini W end of planned Green River Bridge to Longacres Way <br />Description of Work <br />See Attached. <br />Project Agreement End Date 12/31/2020 <br />Proposed Advertisement Date <br />Length 0.17 mile <br />Claiming Indirect Cost Rate <br />Yes ✓ No <br />Type of Work <br />Estimate of Funding <br />(1) <br />Estimated Total <br />Project Funds <br />(2) <br />Estimated Agency <br />Funds <br />(3) <br />Estimated Federal <br />Funds <br />PE a. Agency <br />86.5 % <br />b. Other Consultant <br />$ 214,000.00 <br />$ 29,160.00 <br />$ 186,840.00 <br />Federal Aid c. Other <br />Participation d. State <br />$ 2,000.00 <br />$ 2,000.00 <br />Ratio for PE <br />e. Total PE Cost Estimate (a+b+c+d) <br />$ 216,000.00 <br />$ 29,160.00 <br />$ 188,840.00 <br />Right of Waya f. Agency <br />g. Other <br />Federal Aid h. Other <br />Participation <br />Ratio for RW i. State <br />j. Total RNV Cost Estimate (f+g+h+i) <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Construction k. Contract <br />ok <br />I. Other Contractor <br />m. Other <br />Federal Aid n. Other <br />Participation o. Agency <br />Ratio for CN <br />p. State <br />q. Total CN Cost Estimate (k+(+m+n+o+a) <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />r. Total Proiect Cost Estimate (e+i+a) <br />$ 216,000.00 <br />$ 29,160.00 <br />$ 188,840.00 <br />Agency Official <br />By <br />Title Mayor <br />DOT Form 140-039 <br />Revised 05/2015 <br />Washington State Department of Transportation <br />By <br />Director, Local Programs <br />Date Executed <br />Page 1 <br />5 <br />