City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-06-25 Item 2D - Contract Supplement #1 - 2018 Annual Bridge Inspections and Repairs with TranTech
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-06-25 Transportation and Infrastructure
>
TIC 2018-06-25 Item 2D - Contract Supplement #1 - 2018 Annual Bridge Inspections and Repairs with TranTech
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:02 PM
Creation date
6/21/2018 12:56:42 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/25/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Study <br />Page 1 <br />1 1 <br />EXHIBIT B1 - BudgetTRANTECH <br />1 <br />Engineering <br />LLC <br />City of Tukwila 2018 Bridge Program Engineering Support, Amendment No. 1 <br />Project <br />QA/QC <br />Senior <br />Project <br />Staff <br />Senior <br />Senior <br />Senior <br />Senior <br />Const. <br />Assistant <br />Clerical <br />Total <br />Task Items <br />Manager <br />Engr. <br />Struc. <br />Engr. <br />Struc. <br />Engr. <br />Struc. <br />Engr. <br />Coating <br />Engr. <br />Traffic <br />Engr. <br />CAD <br />Civil <br />Engr. <br />Engr. <br />Inspector <br />_ <br />Task 1 - 196th/ 200th Street Bridge Repair Construction Documents <br />4 <br />8 <br />8 <br />8 <br />8 <br />2 <br />16 <br />2 <br />4 <br />60 <br />Task 2 - 42nd Street Load Rating Services <br />4 <br />4 <br />8 <br />32 <br />32 <br />2 <br />82 <br />Task 4- Miscellaneous Bridge Program Support <br />8 <br />2 <br />2 <br />2 <br />2 <br />2 <br />18 <br />Total Manhours <br />16 <br />14 <br />18 <br />42 <br />42 <br />2 <br />2 <br />16 <br />0 <br />2 <br />0 <br />6 <br />160 <br />Direct Labor Rates (DLR) <br />$ 57.50 <br />$ 59.00 <br />$ 58.00 <br />$ 55.00 <br />$ 39.00 <br />$ 36.00 <br />$ 50.00 <br />$ 37.00 <br />$ 52.00 <br />$ 56.00 <br />$ 36.00 <br />$ 22.00 <br />Total Direct Salary Cost <br />$920 <br />$826 <br />$1,044 <br />$2,310 <br />$1,638 <br />$72 <br />$100 <br />$0 <br />1 $112 <br />$0 <br />$132 <br />$7,154 <br />Profit at 30% of DLR <br />$2,146 <br />Overhead at 1.4272 times DLR <br />$10,210 <br />$19,510 <br />Total Labor Cost <br />Direct Costs (Copy, Fedex, ...) <br />$500 <br />Total <br />$20,010 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.