City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Reg 2018-07-02 Item 3D - Contract Supplement #1 - South 196th / 200th Street Bridge Repairs with TranTech Engineering for $20,000
COT-City
>
City Clerk
>
Council Agenda Packets
>
2018 Council Agenda Packets
>
2018-07-02 Regular
>
Reg 2018-07-02 Item 3D - Contract Supplement #1 - South 196th / 200th Street Bridge Repairs with TranTech Engineering for $20,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2018 8:30:26 AM
Creation date
6/29/2018 8:30:22 AM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
07/02/18
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCOPE OF WORK <br />TRANTECH Engineering <br />2018 Bridge Program Engineering Support <br />Amendment No. 1 <br />City of Tukwila, WA <br />PROJECT DESCRIPTION <br />The City of Tukwila has identified several tasks necessary for the advancement of their Citywide <br />Bridge Program in 2018. These tasks include providing construction documents for west approach <br />span repairs of the 196th/ 200th Street Bridge, permit load rating services to manage the load posting <br />of the 42nd Street truss bridge, and providing miscellaneous engineering support for other bridge <br />program tasks as identified by the City. <br />This Amendment No. 1 provides additional funds to complete the open-ended work as described <br />in the original Scope of Work and as directed by the City. These funds also provide for projected <br />additional work as detailed in the original contract and as required by the City. <br />All work shall be in accordance with the original contract Scope of Work. <br />SCHEDULE <br />The contract schedule shall remain as detailed in the original contract. <br />SCOPE OF WORK — TECHNICAL APPROACH <br />The task items listed below will be performed by TRANTECH for the City in accordance with <br />the original contract Scope of Work. <br />Task 1— 196'11 200th Street Bridge Repair Construction Documents <br />The 90% complete contract documents have been submitted to the City. Amendment No. 1 will <br />provide additional funds to incorporate the final review comments to be provided by the City <br />into the contract documents. A final 100% contract document submittal will be provided to the <br />City as detailed in the original contract documents under Task 1 deliverables. <br />Task 2 — 42°d Street Load Rating Services <br />Amendment 1 will provide additional funds to allow TranTech to finalize load rating analysis <br />currently in progress and to continue providing load rating analysis for any additional trucks <br />identified as requiring permit access to cross the load posted bridge as requested by the City. <br />Task 2 deliverables will remain as detailed in the original contract. <br />Task 4 — Miscellaneous Bridge Program Support <br />Task 4 remains as detailed in the original contract document Scope of Work. <br />Tukwila Bridge Program Engineering Support, Amendment No. 1 -- SCOPE OF WORK Page 1 <br />TRANTECH ENGINEERING <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.