City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Reg 2018-07-02 Item 3D - Contract Supplement #1 - South 196th / 200th Street Bridge Repairs with TranTech Engineering for $20,000
COT-City
>
City Clerk
>
Council Agenda Packets
>
2018 Council Agenda Packets
>
2018-07-02 Regular
>
Reg 2018-07-02 Item 3D - Contract Supplement #1 - South 196th / 200th Street Bridge Repairs with TranTech Engineering for $20,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2018 8:30:26 AM
Creation date
6/29/2018 8:30:22 AM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
07/02/18
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Study <br />EXHIBIT B1 - Budget <br />City of Tukwila 2018 Bridge Program Engineering Support, Amendment No. 1 <br />Task Items <br />TRANTECH <br />Engineering LL( <br />H. <br />Project QA/QC Senior Project Staff Senior I Senior Senior Senior Const. AssistantClerical <br />Manager Engr. Struc. Struc. Struc. I Coating Traffic <br />Engr. Engr. Engr. Engr. Engr. <br />CAD Civil 1 Engr. Inspector <br />Engr. I <br />Total <br />Task 1 - 196th/ 200th Street Bridge Repair Construction Documents <br />8 <br />8 <br />16 <br />2 <br />60 <br />Task 2 - 42nd Street Load Rating Services <br />4 <br />4 <br />8 <br />32 <br />32 <br />82 <br />Task 4 - Miscellaneous Bridge Program Support <br />18 <br />Total Manhours <br />Direct Labor Rates (DLR) <br />Total Direct Salary Cost <br />16 I 14 18 t 42 42 j. 2 I 2 16 0 2 0 6 <br />$ 57.50 $ 59.00 1 $ 58,00 $ 55.00 $ 39,00 $ 36.00 I $ 50.00 $ 37.00 $ 52.00 $ 56.00 $ 36.00 $ 22.00 <br />$920 $826 I $1,044 $2,310 $1,638 $72 $100 $0 I $112 I $0 I $132 <br />I <br />Profit at 30% of DLR <br />Overhead at 1.4272 times DLR4 <br />160 <br />$7,154 <br />$2,146 <br />$10,210 <br />Total Labor Cost $19,510 <br />Direct Costs (Copy, Fedex, ... <br />$500 <br />Total <br />$20,010 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.