Laserfiche WebLink
sink <br />�� Washington State <br />VAPIF Department of Transportation <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />............................ <br />Functio <br />Class <br />nal <br />Priority Number <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />= <br />p1 <br />,c <br />y <br />a° <br />o. <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />00 <br />I <br />WA -11115 <br />Green River Trail <br />Green River Trail <br />Christensen Road to Green River <br />Replace the existing 8 -foot wide Green River Trail with 12 -foot wide concrete paved <br />trail with 2 -foot gravel shoulders, including illumination, CCTV, waytinding, and <br />pedestrian plaza. <br />06/25/18 <br />07/02/18 <br />Federal Funds I <br />State Fund Code <br />28 <br />State Funds <br />0.140 <br />DCE <br />No <br />Funding <br />I Phase I <br />1st <br />I Status <br />I <br />Phase <br />I Phase Start Year (YYYY) I <br />Federal Fund Code I <br />Federal Funds I <br />State Fund Code <br />1 <br />State Funds <br />I <br />Local Funds I <br />Total Funds <br />I <br />CN <br />2021 I <br />STP(E) I <br />896,1401 <br />I <br />1 <br />01 <br />139,8601 <br />1,036,000 <br />I <br />01 <br />1,836,0001 <br />Totals) <br />896,1401 <br />I <br />OI <br />139,8601 <br />1,036,000 <br />'Expenditure Schedule <br />I Phase I <br />1st <br />I <br />2nd <br />I <br />3rd I <br />4th <br />I <br />5th & 6th <br />CN <br />I <br />01 <br />01 <br />1,036,000 <br />01 <br />0 <br />1 <br />Totals) <br />01 <br />01 <br />1,836,0001 <br />01 <br />8 <br />Report Date: May 17, 2018 <br />Page 11 <br />