Laserfiche WebLink
.Ilfil� <br />Washington State <br />P' Department of Transportation <br />01 <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PIN/Project No. B. STIP ID <br />Adopted <br />Amendment <br />A <br />m <br />o <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />C. Project Title= <br />I <br />c <br />D. Road Name or Number <br />Federal Fund Code 1 <br />Federal Funds <br />E. Begin & End Termini <br />01 <br />1 <br />F. Project Description G. Structure ID <br />2 <br />o <br />14 <br />I <br />WA -09873 <br />06/25/18 <br />07/02/18 <br />01 <br />04 <br />CD P S T <br />0.100 <br />DCE <br />Yes <br />0 <br />I <br />RW <br />1 2021 1 <br />0 <br />01 <br />Ped/Bike Program <br />W <br />40,0001 <br />10,0001 <br />50,000 <br />1 <br />S 140th St Intersection Improvements <br />I 2022 I <br />1 <br />01 <br />Ped/Bike Program <br />I <br />568,0001 <br />57,0001 <br />625,000 <br />625,0001 <br />S 140th Street <br />Totals) <br />TotalsI <br />01 <br />OI <br />I <br />675,0001 <br />75,0001 <br />750,000 <br />625,0001 <br />Tukwila International Blvd to <br />0 <br />Design and construct a new traffic signal at the S 140th Street/Tukwila International <br />Blvd intersection <br />Funding <br />1 <br />Status <br />I <br />Phase <br />1 Phase Start Year (YYYY) I <br />Federal Fund Code 1 <br />Federal Funds <br />1 <br />State Fund Code <br />1 <br />State Funds I <br />Local Funds 1 <br />Total Funds <br />P <br />I <br />PE <br />I 2021 I <br />I <br />01 <br />Ped/Bike Program <br />1 <br />67,0001 <br />8,0001 <br />75,000 <br />0 <br />I <br />RW <br />1 2021 1 <br />0 <br />01 <br />Ped/Bike Program <br />1 <br />40,0001 <br />10,0001 <br />50,000 <br />1 <br />CN <br />I 2022 I <br />1 <br />01 <br />Ped/Bike Program <br />I <br />568,0001 <br />57,0001 <br />625,000 <br />625,0001 <br />0 <br />Totals) <br />TotalsI <br />01 <br />OI <br />I <br />675,0001 <br />75,0001 <br />750,000 <br />IExpenditure Schedule <br />1 <br />Phase <br />I <br />1st <br />I <br />2nd <br />I <br />3rd <br />I <br />4th <br />I <br />5th & 6th <br />PE <br />I <br />0 <br />01 <br />75,0001x <br />01 <br />0 <br />RW <br />I <br />0 <br />01 <br />50.0001 <br />01 <br />CN <br />I <br />01 <br />01 <br />01 <br />625,0001 <br />0 <br />TotalsI <br />OI <br />OI <br />125,0001 <br />625,0001 <br />0 <br />Report Date: May 17, 2018 <br />Page 14 <br />