Laserfiche WebLink
AMA <br />®Departnwator Trarevertatian <br />01 <br />CD Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />c <br />m o <br />N . <br />Priority Number <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />Hearing <br />Adopted <br />Amendment <br />Resolution No. <br />improvement Type <br />a <br />2 <br />i <br />z <br />Environmental Type <br />z <br />`— <br />a <br />17 <br />WA -11114 <br />S 144th Street Bridge Sidewalks <br />S 144th Street <br />51st Avenue S to 53rd Avenue S <br />Design of pedestrian improvements to the S 144th Street Bridge over 1-5 to include <br />widening the existing 3 -foot sidewalks to 6 -feet with a barrier to separate vehicles <br />and pedestrians <br />06/25/18 <br />07/02/18 <br />05 <br />0.100 <br />DCE <br />No <br />Funding <br />Status <br />P <br />Phase I Phase Start Year (YYYY) I Federal Fund Code <br />PE <br />2019 I I <br />Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds <br />416, 0001 27,0001 443,000 <br />0 Ped/Bike Program 1 <br />Totals I <br />416,000 27,0001 443,000 <br />Expenditure Schedule <br />Phase <br />PE <br />1st <br />2nd <br />3rd <br />4th <br />443,0001 <br />Totals] <br />443,0001 <br />01 <br />01 <br />of <br />01 <br />] 5th & 6th <br />01 <br />01 <br />Report Date: May 17, 2018 <br />Page 16 <br />