Laserfiche WebLink
wsw <br />CO Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />l�� <br />l c <br />ttt <br />m o <br />8 = <br />Priority Number <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />= <br />_ <br />,o <br />Adopted <br />1 <br />D <br />m <br />I. <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />....................... <br />16 <br />3rd <br />/ 1276(007) TUK-59 <br />06/25/18 <br />07/02/18 <br />5th & 6th <br />01 <br />1 <br />:...............__ <br />0.300 <br />.. <br />DCE <br />Yes <br />01 <br />Strander Blvd./SW 27th St Extension <br />0 <br />ALL <br />1 <br />01 <br />1,450,0001 <br />°I <br />01 <br />Strander Blvd./SW 27th St Extension <br />Totals) <br />4,500,0001 <br />1,450,0001 <br />01 <br />01 <br />West Valley Highway to Naches Ave <br />This project is Phase 3 of a multi -phase improvement that will connect Strander <br />Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in <br />Renton. This project will complete the design, right-of-way and construction phases <br />for the roadway segment between West Valley Hwy and Naches Ave. Project <br />components include a railroad bridge for the Union Pacific RR to provide grade <br />separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway <br />widening of two lanes for a portion of the project segment, a separated joint -use trail, <br />a new trail bridge for the Interurban Trail (including new trail connections to Strander <br />Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal <br />serv8r the Tia Stat. a. d Own e facilKes. Cuffer& fang ON <br />Wrnpinte rrm preDninary eripinntwing and - way grayes, DwrwrwAYInn will be <br />funded as part of a future phase. <br />Funding <br />Status 1 <br />S 1 <br />Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds 1 State Fund Code <br />PE <br />RW <br />2019 <br />2020 <br />STP(UL) <br />STP(UL) <br />Totals <br />3,892,5001 <br />1,254,2501 <br />5,146,7501 <br />State Funds I Local Funds 1 Total Funds <br />01 607,5001 4,500,000 <br />01 195,7501 1,450,000 <br />01 803,2501 5,950,000 <br />Expenditure Schedule <br />Phase <br />1 <br />1st 1 <br />2nd 1 <br />3rd <br />1 <br />4th <br />1 <br />5th & 6th <br />PE <br />1 <br />4,500,0001 <br />01 <br />01 <br />01 <br />0 <br />ALL <br />1 <br />01 <br />1,450,0001 <br />°I <br />01 <br />0. <br />Totals) <br />4,500,0001 <br />1,450,0001 <br />01 <br />01 <br />Report Date: May 17, 2018 <br />Page 18 <br />