Laserfiche WebLink
AM. <br />gr� Washington State <br />.' Department o/ Transportation <br />"Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Priority Number <br />Functional <br />Class <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />Adopted <br />Amendment <br />P <br />Improvement Type <br />Utility Codes <br />Total Length <br />'.. Environmental Type <br />RW Required <br />08 <br />WA -11101 <br />06/25/18 <br />07/02/18 <br />Phase <br />1 Phase Start Year (YYYY) 1 <br />11 <br />CG P S T <br />0.060 <br />DCE <br />No <br />I <br />Local Funds I <br />Total Funds <br />P <br />I <br />PE <br />I 2020 <br />W <br />BR I <br />1,554,0001 <br />RW <br />1 <br />42nd Ave S Bridge Replacement <br />01 <br />546,0001 <br />2,100,000 <br />j <br />I P <br />I <br />RW <br />I 2021 <br />I <br />BR I <br />740,0001 <br />42nd Ave S <br />I <br />01 <br />01 <br />260,0001 <br />1,000,000 <br />P <br />I <br />CN <br />I 2022 <br />I <br />Interurban Avenue S to North Bridge <br />10,206,0001 <br />1,600,0001 <br />I <br />1,250,0001 <br />01 <br />2,444,0001 <br />12,650,000 <br />Design and construct a replacement structure for the existing S 42nd Ave bridge. 8109700 <br />Totalsi <br />12,500,0001 <br />I <br />01 <br />3,250,0001 <br />15,750,000 <br />Funding <br />I <br />Phase <br />I <br />1st <br />Status <br />I <br />Phase <br />1 Phase Start Year (YYYY) 1 <br />Federal Fund Code I <br />Federal Funds 1 <br />State Fund Code <br />I <br />State Funds <br />I <br />Local Funds I <br />Total Funds <br />P <br />I <br />PE <br />I 2020 <br />I <br />BR I <br />1,554,0001 <br />RW <br />1 <br />01 <br />546,0001 <br />2,100,000 <br />j <br />I P <br />I <br />RW <br />I 2021 <br />I <br />BR I <br />740,0001 <br />I <br />01 <br />01 <br />260,0001 <br />1,000,000 <br />P <br />I <br />CN <br />I 2022 <br />I <br />BR I <br />10,206,0001 <br />1,600,0001 <br />I <br />1,250,0001 <br />01 <br />2,444,0001 <br />12,650,000 <br />Totalsi <br />12,500,0001 <br />I <br />01 <br />3,250,0001 <br />15,750,000 <br />[Expenditure Schedule <br />I <br />Phase <br />I <br />1st <br />I <br />2nd I <br />3rd <br />I <br />4th <br />1 <br />5th & 6th <br />I <br />PE <br />I <br />01 <br />1,600,0001 <br />OI <br />250,0001 <br />250,000 <br />I <br />RW <br />_.....__.I <br />Ol <br />01 <br />1,000,0001 <br />01 <br />0 <br />r <br />CN <br />I <br />01 <br />01 <br />250,0001 <br />6,250,0001 <br />6,150,000 <br />I <br />Totals" <br />01 <br />1,600,0001 <br />1,250,0001 <br />6,500,0001 <br />6,400,000 <br />Report Date: May 17, 2018 <br />Page 2 <br />