City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-08-13 Item 2A - Construction Award - Green the Green with Applied Ecology
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-08-13 Transportation and Infrastructure
>
TIC 2018-08-13 Item 2A - Construction Award - Green the Green with Applied Ecology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:04 PM
Creation date
8/9/2018 9:09:06 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/13/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Green the Green CIP <br />Quote Tabulation <br />Contractor <br />Applied Ecology LLC <br />Habitat Restoration Specialists LLC <br />McCann Construction, Inc <br />Transblue LLC <br />7/31/2018 <br />JSH site (sch A) <br />$45,306.58 <br />$89,990.69 <br />$112,992.00 <br />$82,955.05 <br />Harnish Group site <br />(sch B) <br />$75,270.42 <br />$81,754.89 <br />$112,882.00 <br />$72,396.77 <br />tax (10%) <br />$12,057.70 <br />$17,174.56 <br />$22,587.40 <br />$15,535.18 <br />total quote <br />$132,634.70 <br />$188,920.14 <br />$248,461.40 <br />$170,887.00 <br />signed <br />proposal <br />and submitted <br />addendum references <br />yes <br />yes <br />yes <br />no <br />yes <br />yes <br />yes <br />no <br />
The URL can be used to link to this page
Your browser does not support the video tag.