Laserfiche WebLink
City of Tukwila <br />Public Works Department - Henry Hash, Director <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation and Infrastructure Committee <br />FROM: Henry Hash, Public Works Director / ,$- <br />BY: Ryan Larson, Senior Program Manager <br />CC: Mayor Ekberg <br />DATE: August 10, 2018 <br />SUBJECT: Surface Water Fund - 2018 Annual Small Drainage Program <br />Project No. 91841201 <br />Bid Award <br />ISSUE <br />Award a contract to Ceccanti, Inc. for construction of the 2018 Annual Small Drainage Program. <br />Allan Ekberg, Mayor <br />BACKGROUND <br />The Small Drainage Program constructs drainage projects throughout the City that are too large for City staff to complete but <br />are smaller than a typical capital improvement project. The projects originate from citizen complaints and maintenance staff <br />recommendations and are compiled on the Small Drainage Project List. Each year the projects are prioritized based on need, <br />expense, permitting requirements, and length of time on the list. The highest priority projects are then designed and <br />constructed. The 2018 Annual Small Drainage Program was advertised to provide drainage improvements at up to five <br />locations as noted in the attached vicinity map. <br />DISCUSSION <br />The 2018 Annual Small Drainage Program was advertised for bids on July 17 and 24, 2018. Three bids were received and <br />opened on July 31, 2018. The bids were checked, tabulated, and no errors were found. Ceccanti, Inc. is the apparent low <br />bidder with an overall bid of $543,836.40. The engineer's estimate was $491,868.00. <br />FISCAL IMPACT (All amounts include sales tax) <br />The 2018 Small Drainage Program has Surface Water construction funds budgeted at $515,000. Construction management <br />(CM) is budgeted at $80,000, but will be completed by in-house staff, so $35,000 is now being allocated for construction, <br />with the remaining budget available for consultant support. In addition, The King County Flood Control District included <br />$65,378 in their capital budget for the South 180th St Flood Wall Extension, which is part of this 2018 Small Drainage <br />Program. The cost of the flood wall site is eligible for reimbursement based on the bid results, estimated to be $50,000. <br />Bid Results Estimate 2018 Budget <br />Bid Amount (Schedule A & B) $ 543,836.40 $ 491,868.00 $ 515,000.00 <br />Contingency (10%) 54,383.64 <br />Surface Water CM Funds 35,000.00 <br />King County Flood District Funding 50,000.00 <br />Total $ 598,220.04 $ 491 868.00 $ 600,000.00 <br />RECOMMENDATION <br />Council is being asked to award the construction contract for the 2018 Annual Small Drainage Program to Ceccanti, Inc. in <br />the amount of $543,836.40 and consider this item on the Consent Agenda at the August 20, 2018 Regular Meeting. <br />Attachments: CIP Page 96 <br />Vicinity Map <br />Bid Tabulation <br />W:IPW EngIPROJECTSW- DR Projects\Annual Small Drainage Programs12018 SDP (91841201)1Construction\Bid Award\Working DocslInfo Memo Bid Award 2018.docx <br />17 <br />