|
EXHIBIT A - Centurylinlk Cost Share
<br />Bid Tab 2113/18 - SCI Infrastructure
<br />Schedule A- (CENTURYLINX ITEMS),
<br />Joint Trench Agreement, Page 11 of 111
<br />Item Section
<br />Description
<br />Qty Unit
<br />Price
<br />Total
<br />Centurytink
<br />Created: KIPG - 3/25/115 (KAI
<br />53rd Ave 5 Project
<br />Compensation Responsibility
<br />A2
<br />1-05
<br />Roadway Su nest mg
<br />1
<br />LS
<br />1401000.00
<br />S4s.,000.00
<br />a1,254 01
<br />IH gifted Gieen, Ite ins/ Total Project Cost
<br />Ala
<br />1-10
<br />Project Temporary Traffic Control
<br />1
<br />73
<br />0300,030.00
<br />5300,000.00
<br />9939509
<br />IHighllighted Green Items/ Total Project Cost
<br />Item Section
<br />Total Project SCI Cost =
<br />Schedule C - Joint Utilliity Trench Duct Bank (CENTURYLINK ITEMS),
<br />Description Qty Unit Price
<br />sg 6,20,97 Sch A SU bTota I
<br />$9,620,91 Sch A Total
<br />$ 5,953,2419.60
<br />Total
<br />CenturyLink
<br />Compensation Responsibility
<br />CI
<br />1-04
<br />Unexpected Site Clhanges
<br />1
<br />1E317
<br />525,000.00
<br />625,000.00
<br />Only if required for approved CTL CO's
<br />230
<br />CY
<br />$27.50.
<br />$6,32.S..00
<br />Only if required during CTL nitined
<br />equipment installation
<br />C4
<br />.5-31
<br />Sducture Excavation Cldes la Inet Inaul for Joint Witty Trench
<br />4330
<br />00
<br />938.061
<br />5194,54000
<br />61,111461.311/100igg
<br />EBB% SCL„ 25% CTL, 25% COMeaSt
<br />C5
<br />.5-31
<br />Shoeng or Erna Exesurallon, Class.13 for Joint Utility Trenton
<br />20600
<br />SF
<br />51..77
<br />620,600.00
<br />9111illglk
<br />50% SCL„ 25% CTL, 2501 Comcast
<br />05
<br />.5-31
<br />-NUJ Utility Trench Pipe Zone Bedding, Incl. Paul - C.orsmunloatrons.
<br />320
<br />CY
<br />937003
<br />910340.00
<br />91511696.1K11td 411510%
<br />CTL, 50% Comicast
<br />11000
<br />CY
<br />1537.77
<br />$57,000.00
<br />lellgoommE
<br />50% C710, 50% Ccormast
<br />42.0
<br />TON
<br />$35.00.
<br />$15,050.00
<br />villitjitiffig
<br />50% SCL„ 257 CTL, 25% Coracast
<br />013
<br />.5-11
<br />Reschelon of l)n Nit), Contlikts. for Joint tittliity Tenon
<br />1
<br />EST
<br />625,000.00
<br />625,000.00
<br />Only if required for approved CTL 00's
<br />CDI
<br />.5-31
<br />Install! C.ondult, 2 In. Dern. - CENTLJPYLINIK
<br />21200
<br />LF
<br />532.3
<br />EsitiligNktuil
<br />CTL Furnish /City ofTukwila Install
<br />C22
<br />.5-31
<br />Install! C.ondult. 4 In. Dern. - CENTLJPYLINIK
<br />.7400
<br />LF
<br />57.30
<br />61111116144406061611111166
<br />CTL Furnish /ay of Tukwila Install
<br />C26
<br />.5-31
<br />Conduit 1Piser - CE140-15.01.1114
<br />7
<br />EA
<br />593000
<br />611116566,RJR021500551
<br />CIL Furnish /City ot Tukwila Install
<br />Caa
<br />.5-31
<br />Core Orin Existing Vault - CE.NTU1R11LINK.
<br />2
<br />EA
<br />$415.00
<br />Inallatfpliieta
<br />CIL Foolish /1.,ity ot Tukwila Install
<br />C34
<br />.5-31
<br />Install! Ultillty Structure, CENTURNLINIK 2124-TA Vault
<br />1
<br />EA
<br />5330.00
<br />vitiorgggp w Ifft
<br />CTL Furnish /City of' Tukwila Install
<br />035
<br />.5-31
<br />Install! Ultillty Structure, CENTURNLINIK Pedestari
<br />11
<br />EA
<br />52.00.00
<br />65911111011,50Mk51
<br />CTL Furnish /City of' Tukwilla Install
<br />C36
<br />.5-3•1
<br />Install! Unlit y Structure, CENTUPYLINK 45.7-TA VOA
<br />6
<br />EA
<br />$330.00
<br />vIINIOgggigkom
<br />CTL Furnish /City of Tukwila Install
<br />C37
<br />.5-31
<br />Install! Ultillty Structure, CENTURNLINIK .21245 Vault
<br />5
<br />EA
<br />5430.00
<br />6111165661,1#1001500551
<br />CIL Furnish /City ot Tukwila Install
<br />C32
<br />8-3I
<br />Instan Utility Structure, CEIN,TURVILIN,K li. 730 Hanel Hole
<br />1
<br />EA.
<br />$43000
<br />VINIEMIMPAREN
<br />CIL Fun -lush /bpi 05 Tukwila Install
<br />0311
<br />.5-31
<br />Install! _lefty Structure, CENTURYL.1111K .3:x5" 'Vault
<br />1
<br />EA
<br />5430.00
<br />Egoirgoosigg
<br />CTL Furnish /City of' Tukwilla Install
<br />013
<br />8.-03
<br />Install! C.ondult, 2 In. Den - CE.NTURYLINK. Private Sehrroa
<br />11550
<br />LF
<br />$7.30
<br />vligliggyggotoi
<br />CTL Furnish /City of' Tukwilla Install
<br />JUT TRENCH SECT11055 BR E.NK DOW N
<br />$7446750 SCh C Sub:Total
<br />Wash inoton State Salles Tax iihrin 57,445,75
<br />Soh C Total
<br />$81,914.25
<br />Grand Total '0591,53.5.22 Tukwila will invoice CTL this amount"
<br />rfinerere afte, orrrOdienar orete,ren tear:coot far 6,6er
<br />oretruceen qr.-Mier and onse
<br />As:sumptlions, All smirk above within KAN except Bid
<br />Rem C49. An service conversion trenching and conduit
<br />installation ore arty Resiparorbilley outside ROW
<br />Centurtylink responsible for puffing their cable , hook-
<br />ups, connections end removal of existiing equipment
<br />in end outside of RCM.
<br />JOINT TRENCH AGREEMENT- Page 11 of 11 (August 20, 2018)
<br />(between City of Tukwila and CenturyLink Re: 530'd Ave S. project)
<br />1 2
<br />
|