Laserfiche WebLink
EXHIBIT A - Centurylinlk Cost Share <br />Bid Tab 2113/18 - SCI Infrastructure <br />Schedule A- (CENTURYLINX ITEMS), <br />Joint Trench Agreement, Page 11 of 111 <br />Item Section <br />Description <br />Qty Unit <br />Price <br />Total <br />Centurytink <br />Created: KIPG - 3/25/115 (KAI <br />53rd Ave 5 Project <br />Compensation Responsibility <br />A2 <br />1-05 <br />Roadway Su nest mg <br />1 <br />LS <br />1401000.00 <br />S4s.,000.00 <br />a1,254 01 <br />IH gifted Gieen, Ite ins/ Total Project Cost <br />Ala <br />1-10 <br />Project Temporary Traffic Control <br />1 <br />73 <br />0300,030.00 <br />5300,000.00 <br />9939509 <br />IHighllighted Green Items/ Total Project Cost <br />Item Section <br />Total Project SCI Cost = <br />Schedule C - Joint Utilliity Trench Duct Bank (CENTURYLINK ITEMS), <br />Description Qty Unit Price <br />sg 6,20,97 Sch A SU bTota I <br />$9,620,91 Sch A Total <br />$ 5,953,2419.60 <br />Total <br />CenturyLink <br />Compensation Responsibility <br />CI <br />1-04 <br />Unexpected Site Clhanges <br />1 <br />1E317 <br />525,000.00 <br />625,000.00 <br />Only if required for approved CTL CO's <br />230 <br />CY <br />$27.50. <br />$6,32.S..00 <br />Only if required during CTL nitined <br />equipment installation <br />C4 <br />.5-31 <br />Sducture Excavation Cldes la Inet Inaul for Joint Witty Trench <br />4330 <br />00 <br />938.061 <br />5194,54000 <br />61,111461.311/100igg <br />EBB% SCL„ 25% CTL, 25% COMeaSt <br />C5 <br />.5-31 <br />Shoeng or Erna Exesurallon, Class.13 for Joint Utility Trenton <br />20600 <br />SF <br />51..77 <br />620,600.00 <br />9111illglk <br />50% SCL„ 25% CTL, 2501 Comcast <br />05 <br />.5-31 <br />-NUJ Utility Trench Pipe Zone Bedding, Incl. Paul - C.orsmunloatrons. <br />320 <br />CY <br />937003 <br />910340.00 <br />91511696.1K11td 411510% <br />CTL, 50% Comicast <br />11000 <br />CY <br />1537.77 <br />$57,000.00 <br />lellgoommE <br />50% C710, 50% Ccormast <br />42.0 <br />TON <br />$35.00. <br />$15,050.00 <br />villitjitiffig <br />50% SCL„ 257 CTL, 25% Coracast <br />013 <br />.5-11 <br />Reschelon of l)n Nit), Contlikts. for Joint tittliity Tenon <br />1 <br />EST <br />625,000.00 <br />625,000.00 <br />Only if required for approved CTL 00's <br />CDI <br />.5-31 <br />Install! C.ondult, 2 In. Dern. - CENTLJPYLINIK <br />21200 <br />LF <br />532.3 <br />EsitiligNktuil <br />CTL Furnish /City ofTukwila Install <br />C22 <br />.5-31 <br />Install! C.ondult. 4 In. Dern. - CENTLJPYLINIK <br />.7400 <br />LF <br />57.30 <br />61111116144406061611111166 <br />CTL Furnish /ay of Tukwila Install <br />C26 <br />.5-31 <br />Conduit 1Piser - CE140-15.01.1114 <br />7 <br />EA <br />593000 <br />611116566,RJR021500551 <br />CIL Furnish /City ot Tukwila Install <br />Caa <br />.5-31 <br />Core Orin Existing Vault - CE.NTU1R11LINK. <br />2 <br />EA <br />$415.00 <br />Inallatfpliieta <br />CIL Foolish /1.,ity ot Tukwila Install <br />C34 <br />.5-31 <br />Install! Ultillty Structure, CENTURNLINIK 2124-TA Vault <br />1 <br />EA <br />5330.00 <br />vitiorgggp w Ifft <br />CTL Furnish /City of' Tukwila Install <br />035 <br />.5-31 <br />Install! Ultillty Structure, CENTURNLINIK Pedestari <br />11 <br />EA <br />52.00.00 <br />65911111011,50Mk51 <br />CTL Furnish /City of' Tukwilla Install <br />C36 <br />.5-3•1 <br />Install! Unlit y Structure, CENTUPYLINK 45.7-TA VOA <br />6 <br />EA <br />$330.00 <br />vIINIOgggigkom <br />CTL Furnish /City of Tukwila Install <br />C37 <br />.5-31 <br />Install! Ultillty Structure, CENTURNLINIK .21245 Vault <br />5 <br />EA <br />5430.00 <br />6111165661,1#1001500551 <br />CIL Furnish /City ot Tukwila Install <br />C32 <br />8-3I <br />Instan Utility Structure, CEIN,TURVILIN,K li. 730 Hanel Hole <br />1 <br />EA. <br />$43000 <br />VINIEMIMPAREN <br />CIL Fun -lush /bpi 05 Tukwila Install <br />0311 <br />.5-31 <br />Install! _lefty Structure, CENTURYL.1111K .3:x5" 'Vault <br />1 <br />EA <br />5430.00 <br />Egoirgoosigg <br />CTL Furnish /City of' Tukwilla Install <br />013 <br />8.-03 <br />Install! C.ondult, 2 In. Den - CE.NTURYLINK. Private Sehrroa <br />11550 <br />LF <br />$7.30 <br />vligliggyggotoi <br />CTL Furnish /City of' Tukwilla Install <br />JUT TRENCH SECT11055 BR E.NK DOW N <br />$7446750 SCh C Sub:Total <br />Wash inoton State Salles Tax iihrin 57,445,75 <br />Soh C Total <br />$81,914.25 <br />Grand Total '0591,53.5.22 Tukwila will invoice CTL this amount" <br />rfinerere afte, orrrOdienar orete,ren tear:coot far 6,6er <br />oretruceen qr.-Mier and onse <br />As:sumptlions, All smirk above within KAN except Bid <br />Rem C49. An service conversion trenching and conduit <br />installation ore arty Resiparorbilley outside ROW <br />Centurtylink responsible for puffing their cable , hook- <br />ups, connections end removal of existiing equipment <br />in end outside of RCM. <br />JOINT TRENCH AGREEMENT- Page 11 of 11 (August 20, 2018) <br />(between City of Tukwila and CenturyLink Re: 530'd Ave S. project) <br />1 2 <br />