City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-09-10 Item 2C - Grant Acceptance - WA State Department of Ecology Grant for Stormwater Quality Retrofit
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-09-10 Transportation and Infrastructure
>
TIC 2018-09-10 Item 2C - Grant Acceptance - WA State Department of Ecology Grant for Stormwater Quality Retrofit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:06 PM
Creation date
9/6/2018 11:39:47 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/10/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agreement No: W0ca017'Tuvxu0158 <br />Project Title: smmnxmu,outmxWater Quality Retrofit Design <br />Recipient Name: City of Tukwila <br />Page vof 34 <br />Task Goal Statement: <br />The RECIPIENT will complete all design, environmental review, and permitting tasks and respond to ECOLOGY comments <br />inatimely manner. <br />Task Expected Outcome: <br />The project will meet the requirements set forth by the State Environmental Policy Act, cultural resource protection <br />requirements, ECOLOGY water quality facility design standards, and all other applicable federal, state, and local laws and <br />regulations. <br />Recipient Task Coordinator: Michael Perfetti <br />Design Plans and Specs, Environmental Review <br />Deliverables <br />Number <br />� <br />Description <br />Due Date <br />2.1 <br />Copy of SEPA determination documentation, Upload to EAGL and notify <br />ECOLOGY when upload is complete. <br />2.2 <br />Submit ECOLOGY 05-05/106 Form and any supplem"ental cultural resources <br />documentation including Cultural Resource surveys directly to the Ecology <br />Project Manager. Upload the Final Determination Letter to EAGL. <br />2.3 <br />Inadvertent Discovery Plan. Upload to EAGL and notify ECOLOGY when upload <br />is complete. <br />2.4 <br />Design Report. Upload to EAGL and notify ECOLOGY when upload is complete. <br />2.5 <br />Responses to ECOLOGY Design Reportcomments. Upload to EAGL and notify <br />ECOLOGY when uploadJs'complete. <br />2.6 <br />Ecology Design ReportAcceptance Letter. Upload to EAGIL and notify ECOLOGY <br />when upload is complete. <br />2.7 <br />90 Percent Design Package. Upload to EAGL and notify ECOLOGY when upload <br />is complete. <br />2.8 <br />Responses to ECOLOGY 90 Percent Design Plan comments. Upload to EAGL and <br />notify ECOLOGY when upload is complete. <br />2.9 <br />Ecology 90 Percent Design Acceptance Letter. Upload to EAGL and notify <br />ECOLOGY when upload bcomplete. <br />2.10 <br />List ofpermits acquired, and environmental review documents. Upload to <br />EAGLand notify ECOLOGY when upload iscomplete. <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.