TIC 2018-09-10 Item 2D - Contract Amendment #2 - Riverton Creek Flapgate Removal with OTAK
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-09-10 Transportation and Infrastructure
>
TIC 2018-09-10 Item 2D - Contract Amendment #2 - Riverton Creek Flapgate Removal with OTAK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:07 PM
Creation date
9/6/2018 11:40:01 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
9/10/2018
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A-1 Scope of Work <br />Continued <br />technical analysis including the geotechnical report, hydraulic analysis, and structural calculations. <br />Coordination with WSDOT and permitting support services to address comments are beyond the <br />permitting support scope. <br />The following scope is for additional final design services for the recommended stabilization <br />measures based on the geotechnical analysis and additional services to support the City in addressing <br />comments from permitting agencies. This scope also provides additional services for preparation of <br />final bid documents which was removed in Amendment No. 1. <br />The following table provides a summary of the contract value for the project as modified by <br />Amendment No. 2. <br />Contract <br />Authorized Fee <br />Original Contract <br />$105,363.00 <br />Amendment No. 1 <br />$39,993.00 <br />Amendment No. 2 <br />$37,064.00 <br />Total <br />$182,420.00 <br />Scope and Budget Modifications <br />1.1 Project Management and Coordination <br />The scope for this task is increased to provide project management and coordination for an <br />extended project schedule for anticipated construction in 2019. This includes additional services for <br />regular status update meetings with the City, project management, and preparation of project reports <br />and invoices. <br />4.1 JARPA Preparation <br />The scope for this task was reduced with Amendment No.1. The scope for this task is increased to <br />provide services for development of grading quantities to be included in the Joint Aquatic Resources <br />Permit Application (JARPA) being prepared by the City. The quantities will include the revised <br />construction sequencing of the culvert removal and revetment grading. Otak will also provide the <br />project summary narrative via email for the JARPA. <br />4.7 Permitting Support <br />The scope for this task was reduced with Amendment No. 1. This scope provides services for <br />developing responses to comments received during review of permit submittals. The scope for this <br />W:\PW Eng\OTHER \Mike Perfetti\ temp \ Riverton Creek Flapgate\Riverton SOW Amend 2_18_0807.docx 2 <br />36 <br />