City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-09-10 Item 2F - Contract Supplement #1 - 2018 Annual Small Drainage Program Construction Management with KPG
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-09-10 Transportation and Infrastructure
>
TIC 2018-09-10 Item 2F - Contract Supplement #1 - 2018 Annual Small Drainage Program Construction Management with KPG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:07 PM
Creation date
9/6/2018 11:40:26 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/10/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />Construction Management Services <br />Scope of Work <br />August 15, 2018 <br />City of Tukwila <br />2018 Small Drainage Program — Project No. 91841201 <br />This work will provide construction management services for the construction contract to complete the <br />City of Tukwila 2018 Small Drainage Program. These services will include design support, project <br />management, documentation control, materials testing, public involvement, and contract <br />administration during the construction of the project, as detailed below. KPG ("Consultant") will provide <br />to the City of Tukwila ("City") construction management services for the project. <br />A detailed scope for the Contract follows: <br />I. INTRODUCTION <br />The following scope of services and associated costs are based upon the assumptions outlined below. <br />General Assumptions: <br />• The proposed project team will include one part-time documentation control specialist (2 <br />days/week), a part-time resident engineer (1 day/week) during construction activities, sub - <br />consultant to provide services for materials testing, structural review, and other supporting tasks <br />as deemed necessary. <br />• It is anticipated that part time site observation will be required based on contractor's specific <br />activities. The City will provide all required site observation and supporting documentation. <br />• KPG estimates a total project duration of 80 working days including preconstruction service, <br />construction services, and project closeout. No suspensions or stop work periods are anticipated <br />during this duration. <br />• It is anticipated that the KPG will update and modify the Record of Materials (ROM). This scope <br />of services provides the management of the ROM and scheduling of required materials testing <br />respectively. <br />• It is anticipated that the City will review and execute the insurance, bonds, and the Construction <br />Contract. <br />• The City will do all public outreach, and ensure affected residents are notified of impending <br />contractor activities by door to door and/or A -board signs that include date, hours of work, and <br />a staff phone number to call for questions. <br />• The design engineers from KPG and structural subconsultants will be available during <br />construction to answer questions during construction and review RAM's, shop drawings, and <br />2018 Small Drainage Program Page 2 KPG <br />Construction Management Services 8/15/18 <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.