Reg 2018-09-17 Item 3G - Contract Amendment #2 - Riverton Creek Flap Gate Removal with Otak Inc for $37,064
COT-City
>
City Clerk
>
Council Agenda Packets
>
2018 Council Agenda Packets
>
2018-09-17 Regular
>
Reg 2018-09-17 Item 3G - Contract Amendment #2 - Riverton Creek Flap Gate Removal with Otak Inc for $37,064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 4:02:10 PM
Creation date
9/13/2018 3:36:06 PM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
09/17/18
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(47t Aw r' % I ;,! ;< ''it <br /> Allan Ekberg, Mayor <br /> 0 <br /> a <br /> Public Works Department-Henry Hash,Director <br /> INFORMATIONAL MEMORANDUM <br /> TO: Transportation and Infrastructure Committee <br /> FROM: Henry Hash, Public Works Director , ,4 - <br /> BY: Mike Perfetti, Habitat Project Manager <br /> DATE: September 7, 2018 <br /> SUBJECT: Surface Water Fund - Riverton Creek Flapgate Removal Project <br /> Project Number 99830103 <br /> Contract 17-070, Amendment No. 2 <br /> ISSUE <br /> Approve Amendment No. 2 to Contract No. 17-070 with OTAK, Inc. <br /> BACKGROUND <br /> In May 2017,the City entered into a consultant agreement with OTAK, Inc.for design and permitting services for the Riverton <br /> Creek Flapgate Removal Project. This project will increase salmonid accessibility to rearing habitat in Riverton Creek by removing <br /> two culverts and flap gates at the mouth of the creek and replacing a section of at-grade trail with a bridge over the restored open <br /> channel. <br /> DISCUSSION <br /> Under the original scope of work, Otak performed a review of the previous design work(Berger ABAM, 2009),and found that on- <br /> site geotechnical evaluation,cultural resources, and hydraulic modeling and scour analysis had not been provided,though stability <br /> concerns had been documented. <br /> OTAK's Amendment No. 1 added geotechnical services and some additional scope to revise the channel section to address long- <br /> term stability concerns. As a result, the team is recommending that a second row of tie-back anchors be installed in the existing <br /> sheet pile wall (supporting Tukwila International Blvd.), and a new,taller soldier pile wall be installed on the east side of the <br /> channel to minimize disturbance and excavation of the existing soils and parking lot.After a constructability review,the team also <br /> recommends revising the construction sequencing shown in the 2009 design in order to reduce the risk for mobilization of <br /> sediment into the Duwamish River during channel excavation. Sediment mobilization will likely be a concern to the environmental <br /> reviewing agencies. <br /> The proposed Amendment No. 2 will incorporate current findings and recommendations into final design and bid documents that <br /> will include the realigned creek channel, improved sheet pile wall design, improved construction sequencing, and services to <br /> support the City in addressing permit agency comments. <br /> FISCAL IMPACT <br /> Amendment No. 2 is for$37,064.00, bringing the total contract amount to$182,420. To fund Amendment No. 2,the project will <br /> utilize remaining 2018 CIP surface water design funds and the 2019 design budget,then be partially or wholly reimbursed through <br /> the 2017 SRFB design and construction grant of$846,965.00 (The match requirement is$149,465.). <br /> Agreement 2018/2019 Budget <br /> Original OTAK Contract+Amendment No. 1 $ 145,356.00 $ 145,356.00 <br /> OTAK Amendment No. 2 37,064.00 40,730.00 <br /> $182.420.00 $186,086.00 <br /> RECOMMENDATION <br /> Council is being asked to approve design Amendment No.2 for$37,064.00 with OTAK, Inc.for the Riverton Creek Flapgate <br /> Removal Project and consider this item on the Consent Agenda at the September 17, 2018 Regular Meeting. <br /> Attachments:Page 93,Proposed 2019—2024 CIP <br /> OTAK Supplemental Agreement#2 <br /> 61 <br /> W:1PW Eng1PROJECTSIA-DR Projects\Riverton Flap Gate Removal(99830103 98-DR03)1Consultant Selection\Phase 21contract\Amendment#21Info Memo Otak PE Amend 42 20180810g1.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.