Laserfiche WebLink
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br /> 2019 to 2024 <br /> PROJECT: Riverton Creek Flap Gate Removal Project No. 99830103 <br /> Remove two culverts and flap gates at Duwamish River; install pipe arch, create open channel <br /> DESCRIPTION: confluence, install trail bridge over new channel, restore/revegetate 200 feet of creek channel and <br /> 450 ft. of pond shoreline. <br /> JUSTIFICATION: Increase available salmonid rearing habitat and increase flood refuge in lower Duwamish River. <br /> Improve fish access to Riverton Creek and enhance salmon rearing and resting area. <br /> STATUS: Design underway in 2018. Construction grant of$846k from WA State RCO. <br /> MAINT. IMPACT: Expected to increase maintenance. <br /> COMMENT: Project used as mitigation for East Marginal Way Pipe Replacement Project and HPA <br /> Control#133763-1 requires work to be completed by June 11, 2019,which will need to be extended. <br /> FINANCIAL Through Estimated <br /> (in$000's) 2017 2018 2019 2020 2021 2022 2023 • 2024 BEYOND TOTAL <br /> EXPENSES <br /> Design 204 100 40 344 <br /> Land (R/W) 0 <br /> Monitoring 15 15 15 15 15 15 90 <br /> Const. Mgmt. 184 184 <br /> Construction 918 918 <br /> TOTAL EXPENSES 204 100 1,142 15 15 15 15 15 15 1,536 <br /> FUND SOURCES <br /> Awarded Grant 72 847 919 <br /> Proposed Grant 0 <br /> Mitigation Actual 0 <br /> Mitigation Expected 0 <br /> Utility Revenue 132 100 295 15 15 15 15 15 15 617 <br /> TOTAL SOURCES 204 100 1,142 15 15 15 15 15 15 1,536 <br /> Project Location .\ ,ffi10p' 1����,�y s e N <br /> �°m®, a_ W*Ai <br /> F I' <br /> fill- s <br /> 1111, <br /> 1 r,,i .,, 1,111.11 <br /> ‘,,,.: <br /> AI 1 <br /> . , \. .. <br /> 1111 <br /> II 410‘111 .' 4..,, , <br /> 11111 <br /> alrl <br /> 111 L it. l'1111111"e" _,,,,- -" \t` <br /> r - iiL°oA S30 "v1G/ �� V o <br /> 2019-2024 Capital Improvement Program 93 63 <br />