City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
FIN 2018-10-02 Item 2A - Handout Distributed at Meeting - Public Safety Plan Request for Proposal: Tukwila Justice Center
COT-City
>
City Clerk
>
Council Committees
>
Finance (2017-2020)
>
Finance Agenda Packets (2017-Present)
>
2018-10-02 Finance
>
FIN 2018-10-02 Item 2A - Handout Distributed at Meeting - Public Safety Plan Request for Proposal: Tukwila Justice Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:12:55 PM
Creation date
10/3/2018 4:28:45 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
10/02/18
Committee Name
Finance 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Approach <br />• Review of the complete project manual and drawings to ensure necessary references and <br />coordination language is place with respect to the potential for impacting and/or working <br />adjacent to regulated building materials. <br />• Attendance at design meetings with the project team, pre -bid walk through meetings, pre - <br />construction meetings, and weekly progress meetings during the abatement portions of the <br />project as needed. <br />• Provide addenda/clarification as required. <br />Construction Administration Services <br />• Full time on -site monitoring during abatement activity associated with each school included <br />in the scope of work including the collection and analysis of asbestos air samples (Phase <br />Contrast Microscopy - NIOSH Method 7400) within the work area and adjacent occupied <br />areas. PCM analysis will be performed on site by the NOVO technician. <br />Daily verification and documentation of abatement quantities removed to ensure accurate <br />comparison with quantities listed in section 01 11 10 of the project manual. <br />Pre -abatement air sampling to establish airborne fiber concentrations within the building <br />prior to starting abatement work. <br />• Final visual clearance inspection, and air clearance sampling of abated areas, as required by <br />WAC 296-62-07709. <br />• Final walkthrough of each work area to verify that identified asbestos -containing materials <br />intended for removal have been removed by the contractor. <br />• Perform final clearance inspection of abated areas and conduct air sampling per WAC 296- <br />62-07709. <br />• Provide project management for resolution of regulated building materials issues during the <br />construction process. <br />• Review Contractor's pre job, weekly, and post job submittal documents. <br />• Provide Record of Asbestos Abatement Project forms for each area where ACM has been <br />removed, repaired, encapsulated, or otherwise affected by the project. Completed forms will <br />be submitted to the District asbestos Program Manager and Project Manager within ten (10) <br />days of receipt of clearance of air monitoring results. <br />• Submit a final close-out report including observations, laboratory data and contractor <br />submittals. <br />C.IUSERSIRICHARDC.4RLSONIDROPBOXICONSULTINGIPROPOSCLS120181 /8 //1_CITYOFTUKWILAIREPINOVO PROPOSAL CITY OF <br />TUKWILA RFP. DOC <br />