City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-10-08 Item 2C - Final Acceptance - Interurban Avenue South (South 143rd Street to Fort Dent Way) with Walsh Construction Company
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-10-08 Transportation and Infrastructure
>
TIC 2018-10-08 Item 2C - Final Acceptance - Interurban Avenue South (South 143rd Street to Fort Dent Way) with Walsh Construction Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:09 PM
Creation date
10/4/2018 3:09:36 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
10/08/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OP <br />Final Contract <br />Voucher Certificate <br />Contractor <br />Walsh Construction Co II LLC <br />Street Address <br />16400 Southcenter Parkway, Ste 501 <br />City <br />Seattle <br />State <br />WA <br />Zip <br />98188 <br />Date <br />8/14/18 <br />City Project Number <br />03-RW02 — 90310402 <br />Federal -Aid Project Number <br />STPUL-1045(007) <br />Contract Title <br />Interurban Ave S. Roadway Improvements <br />Date Work Physically Completed <br />June 16,2016 <br />Final Amount <br />$8,917,921.31 <br />Contractors Certification <br />1, the undersigned, having first been duly sworn, certify that I am authorized to sign for the claimant; that in connection <br />with the work performed and to the best of my knowledge no loan, gratuity or gift in any form whatsoever has been <br />extended to any employee of the City of Tukwila nor have I rented or purchased any equipment or materials from any <br />employee of the City of Tukwila; I further certify that the attached final estimate is a true and correct statement showing all <br />the monies due me from the City of Tukwila for work performed and material furnished under this contract; that I have <br />carefully examined said final estimate and understand the same and that I hereby release the City of Tukwila from any <br />and all claims of whatsoever nature which I may have, arising out of the performance of said contract, which are not set <br />forth in said estimate. <br />0NCNEC �fido <br />Signature Required <br />Ray Riojas, Area Manager <br />ibed and sworn to before me this <br />kQ(.,Ortary Public in and for the State of <br />Residing at <br />Printed Signature Name <br />day of Ze ck . 20 <br />5\4 <br />Owner Certification <br />I, certify the attached final estimate to be based upon actual <br />measurements, and to be true and correct. <br />x �d <br />1 <br />Project EngineeY/ Projec Administrator <br />Approved Date <br />Public Works Director <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.