Decision Type
<br />iscellaneous Services and Charges (con()
<br />Public Notice Mailing Fee per address for each
<br />mailina
<br />2017 2018
<br />Fees Fees
<br />Plus
<br />Hearing
<br />Examiner
<br />Fees
<br />Pus
<br />Technology
<br />Fee (TF)
<br />Section 5. Building permit fees will be charged according to the following
<br />schedule:
<br />Total Valuation
<br />51 to $500
<br />$501 to $2,000
<br />$2,001 to $25,000
<br />$25,001 to $50,000
<br />50,001 to $100,000
<br />$100,001 to $500,000
<br />500,001 to $1,000,000
<br />$1,000,001 to $5,000,000
<br />$5„000,001 and up
<br />BUILDING PERMIT FEE SC EDULE
<br />Building Permit Fees
<br />$66,30 + Technology Fee
<br />$66.30 for the first $500, plus $4.39 for each additional $100„ or fra,ction
<br />thereof, to and including $2,000, + Technology Fee
<br />$132.09 for the first $2„000, plus $19.99 for each additional $1,000, or
<br />fraction thereof, to and including $25,000, + Technology Fee
<br />$612.41 for the first $25,000, plus $15,61 for each additional $1,000, or
<br />fraction thereof, to and including $50,000, + Technology Fee
<br />$1,002.92 for the first $50,000, plus $10,81 for each additional $1,000, or
<br />fraction thereof, to and including $100,000, + Technology Fee
<br />$1,541.83 for the first $100„000, plus $8.67 for each additional $1,000, or
<br />fraction thereof to and including $500,000, + Technology Fee
<br />$5,004.43 for the first $500,000, plus $7,14 for each additional $1,000, or
<br />fraction thereof,, to and including $1,000,000, + Technology Fee
<br />$8,612.12 for the first, $1,000,000, plus $4.79 for each additional $1,000,
<br />or fraction thereof, to and including $5,000„000, + Technology Fee
<br />$27,788,12 for the first $5,000.000, plus $4.59 for each $1,000 or fraction
<br />thereof, + Technology Fee
<br />A. Non-Structurall Plan Review Fee. A non-structural plan review fee shall be
<br />paid at the time of submitting plans and specifications for review, The non-structural
<br />plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee
<br />schedule, The non-structural plan review fee specified herein is a separate fee from the
<br />permit fee and is in addition to the permit fee,
<br />B. Structural Plan Reviw Fee. Where a structural plan review is deemed
<br />necessary, a structural plan review fee shall be charged, The structural plan review fee
<br />shall be 35% of the calculated non-structural plan review fee.
<br />WAVVord Processing \Resolutions\Consolidated permit fee schedule 2019-2020 10-12-18
<br />NG:bjs
<br />Page 7 of
<br />61
<br />
|