Laserfiche WebLink
Decision Type <br />iscellaneous Services and Charges (con() <br />Public Notice Mailing Fee per address for each <br />mailina <br />2017 2018 <br />Fees Fees <br />Plus <br />Hearing <br />Examiner <br />Fees <br />Pus <br />Technology <br />Fee (TF) <br />Section 5. Building permit fees will be charged according to the following <br />schedule: <br />Total Valuation <br />51 to $500 <br />$501 to $2,000 <br />$2,001 to $25,000 <br />$25,001 to $50,000 <br />50,001 to $100,000 <br />$100,001 to $500,000 <br />500,001 to $1,000,000 <br />$1,000,001 to $5,000,000 <br />$5„000,001 and up <br />BUILDING PERMIT FEE SC EDULE <br />Building Permit Fees <br />$66,30 + Technology Fee <br />$66.30 for the first $500, plus $4.39 for each additional $100„ or fra,ction <br />thereof, to and including $2,000, + Technology Fee <br />$132.09 for the first $2„000, plus $19.99 for each additional $1,000, or <br />fraction thereof, to and including $25,000, + Technology Fee <br />$612.41 for the first $25,000, plus $15,61 for each additional $1,000, or <br />fraction thereof, to and including $50,000, + Technology Fee <br />$1,002.92 for the first $50,000, plus $10,81 for each additional $1,000, or <br />fraction thereof, to and including $100,000, + Technology Fee <br />$1,541.83 for the first $100„000, plus $8.67 for each additional $1,000, or <br />fraction thereof to and including $500,000, + Technology Fee <br />$5,004.43 for the first $500,000, plus $7,14 for each additional $1,000, or <br />fraction thereof,, to and including $1,000,000, + Technology Fee <br />$8,612.12 for the first, $1,000,000, plus $4.79 for each additional $1,000, <br />or fraction thereof, to and including $5,000„000, + Technology Fee <br />$27,788,12 for the first $5,000.000, plus $4.59 for each $1,000 or fraction <br />thereof, + Technology Fee <br />A. Non-Structurall Plan Review Fee. A non-structural plan review fee shall be <br />paid at the time of submitting plans and specifications for review, The non-structural <br />plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee <br />schedule, The non-structural plan review fee specified herein is a separate fee from the <br />permit fee and is in addition to the permit fee, <br />B. Structural Plan Reviw Fee. Where a structural plan review is deemed <br />necessary, a structural plan review fee shall be charged, The structural plan review fee <br />shall be 35% of the calculated non-structural plan review fee. <br />WAVVord Processing \Resolutions\Consolidated permit fee schedule 2019-2020 10-12-18 <br />NG:bjs <br />Page 7 of <br />61 <br />