City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-11-13 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-11-13 Transportation and Infrastructure
>
TIC 2018-11-13 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:10 PM
Creation date
11/8/2018 9:34:11 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/13/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />STATUS: <br />MAINT. IMPACT: <br />COMMENT: <br />2017 to 2022 <br />Strander Blvd Extension Phase 3 Project No. 98610403 <br />Design and construct arterial improvements for a new roadway extending Strander Blvd/SW 27th St <br />from West Valley Highway to Oaksdale Ave in the City of Renton. <br />East/west capacity between 1-405 and S 180 St is needed to serve Tukwila and Renton access. <br />Project segregated into three phases. Phase I extended Stander Blvd/SW 27th St from Oaksdale Ave to <br />Naches Ave SW. Phase!! constructed a 2 lane road from Naches to the Sounder Train's Tukwila Longacres <br />Station's parking lot. Paid Renton $1 m for Phase! & II. Phase III will construct the undercrossing of the <br />UPRR and complete the 4 lane roadway from West Valley Hwy in Tukwila to Naches Ave SW in Renton. <br />New street. <br />Project partners include the City of Renton, Boeing, WSDOT, FMSIB, Sound Transit, Metro, Amtrak, and <br />BNSF and UP Railroads. Funds in 2015-16 are for updated cost estimates and grant applications. <br />STP (PSRC), FAST Lane, and TIGER grants were submitted in 2016. <br />FINANCIAL <br />(in $000's) <br />Through Estimated <br />2015 2016 2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />2022 <br />BEYOND TOTAL <br />EXPENSES <br />Design <br />58 <br />440 <br />2,500 <br />2,000 <br />4,998 <br />Land (R/W) <br />104 <br />450 <br />1,000 <br />1,554 <br />Wetland Mitigation <br />50 <br />500 <br />550 <br />Const. Mgmt. <br />2,800 <br />2,000 <br />4,800 <br />Construction <br />15,000 <br />12,200 <br />27,200 <br />TOTAL EXPENSES <br />162 <br />440 <br />3,000 <br />3,000 <br />18,300 <br />14,200 <br />0 <br />0 <br />0 <br />39,102 <br />FUND SOURCES <br />Awarded STP Grant <br />2,551 <br />2,595 <br />5,146 <br />Proposed TIGER Grant <br />7,900 <br />5,894 <br />13,794 <br />Proposed State TIB Grant <br />2,500 <br />2,500 <br />5,000 <br />Proposed FMSIB Grant <br />2,500 <br />2,500 <br />5,000 <br />Proposed STP Grant <br />5,000 <br />3,000 <br />8,000 <br />City Oper. Revenue 162 <br />440 <br />449 <br />405 <br />400 <br />306 <br />0 <br />0 <br />0 <br />2,162 <br />TOTAL SOURCES 162 <br />440 <br />3,000 <br />3,000 <br />18,300 <br />14,200 <br />0 <br />0 <br />0 <br />33,956 <br />2017 - 2022 Capital Improvement Program <br />13 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.