HomeMy WebLinkAboutReg 2018-11-19 Item 3H - Agreement - Strander Boulevard Extension Phase III Value Engineering Consultant for $75,000COUNCIL AGENDA SYNOPSIS
Initials
MeetinsDate
Prepared by
Mayor's review
Counci I review
11/19/18
HH
1L/4 -
ITEM INFORMATION
ITEM No.
3.H.
STAFF SPONSOR: HENRY HASH
ORIGINAL AGENDA DATE: 11/19/18
AGENDA ITIMTITu1 Strander Boulevard Extension Phase 3
Value Engineering Consultant Agreement
CATEGORY LI Discussion
Mtg Date
M Motion
Mtg Date 11/19/18
[I] Resolution
Mtg Date
111 Ordinance
Mg Date
11 Bid Award
Mtg Date
0 Public Hearing
Mtg Date
11] Other
Mtg Date
SPONSOR LICouncil 0Mayor LIFJR El DCD LIFinance Ohre LITS LIP&R LIPolice HPW LICourt
SP °Molt' S Council is being asked to approve a consultant contract for Value Engineering of the
SUMMARY Strander Boulevard Extension Phase 3 Project in the not to exceed amount of $75,000. The
design consultant is currently at the 30% level and a value engineering consultant contract
will analyze the project's scope and costs. RFQs were published and three consultants
responded with interviews forthcoming. Due to time constraints, Council is being asked to
authorize a contract in the not to exceed amount of $75,000.
REVIEWED BY
LI C.O.W.
Mtg. III CDN Comm LI Finance Comm. El Public Safety Comm.
LI Arts Comm. LI Parks Comm. LI Planning Comm.
COMMITTEE CHAIR: THOMAS MCLEOD
Trans &Infrastructure
DATE: 11/13/18
RECOMMENDATIONS:
SPONSOR/ADMIN.
CommuTIT
Public Works Department
Unanimous Approval; Forward to Consent Agenda
COST IMPACT / FUND SOURCE
ExPI NDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$75,000.00 $6,128,000.00 $
Fund Source: 104 ARTERIAL STREET FUND
Comments: (page 10, Proposed 2019 CIP)
MTG. DATE
RECORD OF COUNCIL ACTION
11/19/18
MTG. DATE
ATTACHMENTS
11/19/18
Informational Memorandum dated 11/09/18
2017 CIP, page 13 and page 10, Proposed 2019 CIP
Current project cost estimate
Minutes from the Transportation and Infrastructure Committee 11/13/18
117
118
Allan Ekberg, Mayor
Public Works Department - Henry Hash, Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Henry Hash, Public Works Director 4f//
BY: Steve Carstens, PE, Senior Program Manager
CC: Mayor Ekberg
DATE: November 9, 2018
SUBJECT: Strander Boulevard Extension Phase 3
Project No. 98610403
Project Update and Value Engineering Consultant Approval
ISSUE
Update on the Strander Blvd Extension Phase 3 Project and approve Value Engineering consultant contract.
BACKGROUND
The City of Renton completed Phase 1 of the Strander Boulevard/SW 27th Street (Oakesdale Avenue to Naches
Avenue) in 2008 and Phase 2 (Naches Avenue to the new Tukwila Station/Sounder Commuter Rail Station
parking lot, between BNSF and UPRR) in 2014. Phase 3 is being led by the City of Tukwila. Tukwila received
Federal grant funding for the preliminary engineering and right-of-way phases and is proceeding with the design
process as part of the preliminary engineering phase.
DISCUSSION
In May 2018, Berger ABAM (Berger) provided the City with the 30% plans for review and an updated cost
estimate of the total project costs. Since May 2018, the consultant and staff have been focused on addressing the
comments on the 30% plans and continuing utility coordination.
A Value Engineering Request for Qualifications (RFQ) was advertised and three consultants responded on
November 1, 2018 and will be interviewed for a forthcoming consultant contract. Due to time constraints, we are
asking approval for the Value Engineering consultant contract in a not to exceed amount of $75,000.
FISCAL IMPACT Amount Expended to date $1,509,677
Current Funding and Expenditures
Budget Actuals Proposed
CIP Budget $5,628,000
WSDOT Discretionary Funding (additional) 500,000
Berger Abam Design Contract $4,147,328
Berger Abam Early Start 2016 313,853
BP/Olympic Pipeline Design 630,000
UPRR Design 25,000
Staff and Miscellaneous Expenses 72,934 $ 60,000
Berger Abam Design Supplement 166,000
Value Engineering Study (Approx.) 75,000
Sprint Engineering Costs 20 000
Subtotal $6,128 000 $5.189.115 $321,000
Subtotal (Actuals plus Proposed) $5,510,115
Current Discretionary Funds and Project Balance $617.885
W:\PW Eng\PROJECTS\A- RW & RS Projects\Strander Extension (98610403)\01_Preliminary Engineering\20181113 TIC update (003) gl.docx
119
Page 2
Strander Blvd Phase 3
November 9, 2018
Total Project Cost (Design, RW, and Construction) $83,781,626
Subtract Project Costs with Secured Funding (18,963,961)
Funding Gap (unsecured) ($64,817,665)
It should be noted, staff anticipates that there may be additional design supplements in the future related to the
outcome of the Value Engineering study as Berger may need to modify the Strander Blvd Phase 3 design. There
also may be additional utility relocation design fees.
There is an additional $500,000 in WSDOT discretionary funds that were provided to the City in June 2017. These
funds can be used for any phase of the project and staff is electing to use them in the Preliminary Engineering
(design) phase.
Project Timeline
2018 (September -December)
2019 (January — March)
2019 (May)
2019 (October)
2020 (October)
2020 (Jan) to 2029 (Dec)
Funding Timeline
2019 (September)
2020 (January)
2030 (January)
Continue utility coordination and address 30% design comments
Perform Value Engineering (VE) study
Complete revised 30% plans incorporating VE changes
Complete right-of-way phase
Complete final plans, specifications, and estimate. Project ready to go out to bid
Project required to be under construction during this time period and completed
by December 2029.
If the project is not under construction by September 2019, FASTLANE's $5
million must be relinquished to funding source. Note, there is no direct transfer of
funding from these organizations to the City for the construction phase, so the
funds would be 'unobligated' and not made available to the City after this date.
City would need to provide an additional $5 million for construction costs/funding
gap.
If the project is not under construction by January 2020, FMSIB's $5 million must
be relinquished to funding source. Note, there is no direct transfer of funding from
these organizations to the City for the construction phase, so the funds would be
'unobligated' and not made available to the City after this date. City would need
to provide an additional $5 million for construction costs/funding gap.
If the project is not constructed/completed by January 2030, all federal funds
used for design and right-of-way must be returned to federal funding source
($5,646,750).
RECOMMENDATION
Council is being asked to authorize the Mayor to approve the Value Engineering consultant contract for the
Strander Boulevard Phase 3 Project with a not to exceed amount of $75,000 and consider this item on the
Consent Agenda at the November 19, 2018 Regular Meeting.
ATTACHMENTS
• 2017 CIP, pg. 13 and Draft 2019 CIP pg. 10
• Current estimate
W:\PW Eng\PROJECTS\A- RW & RS Projects\Strander Extension (98610403)\01_Preliminary Engineering\20181113 TIC update (003) gl.docx
120
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
Strander Blvd Extension Phase 3 Project No. 98610403
Design and construct arterial improvements for a new roadway extending Strander Blvd/SW 27th St
from West Valley Highway to Oaksdale Ave in the City of Renton.
East/west capacity between 1-405 and S 180 St is needed to serve Tukwila and Renton access.
Project segregated into three phases. Phase I extended Stander Blvd/SW 27th St from Oaksdale Ave to
Naches Ave SW. Phase II constructed a 2 lane road from Naches to the Sounder Train's Tukwila Longacres
Station's parking lot. Paid Renton $1 m for Phase I & II. Phase III will construct the undercrossing of the
UPRR and complete the 4 lane roadway from West Valley Hwy in Tukwila to Naches Ave SW in Renton.
New street.
Project partners include the City of Renton, Boeing, WSDOT, FMSIB, Sound Transit, Metro, Amtrak, and
BNSF and UP Railroads. Funds in 2015-16 are for updated cost estimates and grant applications.
STP (PSRC), FAST Lane, and TIGER grants were submitted in 2016.
FINANCIAL
(in $000's)
Through Estimated
2015 2016 2017
2018
2019
2020
2021
2022
BEYOND TOTAL
EXPENSES
Design
58
440
2,500
2,000
4,998
Land (R/W)
104
450
1,000
1,554
Wetland Mitigation
50
500
550
Const. Mgmt.
2,800
2,000
4,800
Construction
15,000
12,200
27,200
TOTAL EXPENSES
162
440
3,000
3,000
18,300
14,200
0
0
0
39,102
FUND SOURCES
Awarded STP Grant
2,551
2,595
5,146
Proposed TIGER Grant
7,900
5,894
13,794
Proposed State TIB Grant
2,500
2,500
5,000
Proposed FMSIB Grant
2,500
2,500
5,000
Proposed STP Grant
5,000
3,000
8,000
City Oper. Revenue 162
440
449
405
400
306
0
0
0
2,162
TOTAL SOURCES 162
440
3,000
3,000
18,300
14,200
0
0
0
33,956
2017 - 2022 Capital Improvement Program
13
121
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2019 to 2024
Strander Blvd Extension Phase 3 Project No. 98610403
Design and construct arterial improvements for a new roadway extending Strander Blvd/SW 27th St
from West Valley Highway to Naches Ave SW in the City of Renton.
East/west capacity between 1-405 and S 180 St is needed to serve Tukwila and Renton access.
Project segregated into three phases. Phase I extended Stander Blvd/SW 27th St from Oaksdale Ave to
Naches Ave SW. Phase II constructed a 2 lane road from Naches to the Sounder Train's Tukwila Longacres
Station's parking lot. Paid Renton $1m for Phase I & II. Phase III will construct the undercrossing of the
UPRR and complete the 4 lane roadway from West Valley Hwy in Tukwila to Naches Ave SW in Renton.
New street.
Project partners include the City of Renton, Boeing, WSDOT, FMSIB, Sound Transit, Metro, Amtrak, and
BNSF and UP Railroads. Funds in 2015-16 are for updated cost estimates and grant applications.
STP (PSRC), FAST Lane, and TIGER grants were submitted in 2016.
FINANCIAL
(in $000's)
Through Estimated
2017 2018 2019
2020
2021
2022
2023
2024
BEYOND TOTAL
EXPENSES
Design
359
3,269
2,000
5,628
Land (R/W)
104
1,720
1,824
Wetland Mitigation
50
500
550
Const. Mgmt.
2,000
2,000
4,000
Construction
35,889
35,889
71,778
TOTAL EXPENSES
463
3,319
3,720
38,389
37,889
0
0
0
0
83,780
FUND SOURCES
Awarded STP Grant
1,946
3,200
5,146
Proposed STP Grant
4,760
4,760
Awarded Fastlane Grant
2,500
2,500
5,000
Awarded FMSIB Grant
2,500
2,500
5,000
Proposed Build America
25,000
25,000
Proposed State TIB Grant
12,000
12,000
Proposed State/Federal
8,389
16,129
24,518
City Oper. Revenue 463
1,373
520
0
0
0
0
0
0
2,356
TOTAL SOURCES 463
1,373
3,720
38,389
37,889
0
0
0
0
83,780
° Q Project Location
ti �o
;
_.]� I 160 at
I _ _-..JV
R 4�iI
1.. ..,4
rua
11110
.btia
*n C.
_
r
� P
o
"g
'..
I
W Ali ♦ °
,.[(rtamo ` s
' � re
u u ° Pr
Tn_ 0,
[J....,...4
f �f /
S ,Otltli
-.-�
T
2019 - 2024 Capital Improvement Program
122
10
1 of 12
Item
No,
Schedule A
Desc
Quontity
Std. Item
No.
Item Description
Unit
Unit
Cost
Schedule A
Desc
Cost
Schedule B
Desc
Cost
Schedule C
Desc
Cost
Total
All Schedules
MOBILIZATION
1 1 1 0001 1MOBILIZATION
IL.S. I 15.0%
$8,681,105
$8,681,105
$0
$0
$0
$0
$8,681,105
$8,681,105
PREPARATION
2
1
0035
CLEARING AND GRUBBING
L.S.
$ 70,200
$ 70,200
$ -
$ -
S 70,200
3
3
0047
REMOVING MANHOLE
EACH
$ 1,050
$ 3,150
$ -
$ -
$ 3,150
4
42
0049
REMOVING DRAINAGE STRUCTURE
EACH
$ 980
$ 41,160
S -
$ -
$ 41,160
5
I
0050
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
L.S.
$ 144,000
$ 144,000
$ -
$ -
$ 144,000
6
955
0100
REMOVING CEMENT CONC. SIDEWALK
S.Y.
$ 80
$ 76,400
$ -
$ -
$ 76,400
7
2.363
0108
REMOVING CEMENT CONC. CURB AND GUTTER
L.F.
$ 21
$ 49,623
$ -
$ -
$ 49,623
8
898
0110
REMOVING CEMENT CONC. CURB
L.F.
$ 7
$ 6,286
$ -
$ -
$ 6,286.
9
6,600
0120
REMOVING ASPHALT CONC. PAVEMENT
S.Y.
$ 12
$ 79,200
S -
$ -
$ 79,200
10
703
0130
REMOVING ASPHALT CONC. SIDEWALK
S.Y.
$ 8
$ 5,624
$ -
$ -
S 5,624
II
98
0150
REMOVING TRAFFIC ISLAND
S.Y.
$ 78
$ 7,644
$ -
$ -
S 7,644
12
136
0170
REMOVING GUARDRAIL
L.F.
$ 11
$ 1,496
$ -
$ -
$ 1,496
13
4
0182
REMOVING GUARDRAIL ANCHOR
EACH
$ 322
$ 1,288
$ -
$ -
S 1,288
14
3,832
0187
REMOVING PAINT LINE
L.F.
$ 1
$ 4,982
$ -
$ -
$ 4,982
15
16
0199
REMOVING PAINTED TRAFFIC MARKING
EACH
$ 116
$ 1,856
$ -
$ -
$ 1,856
16
796
0203
REMOVING PAINTED CROSSWALK LINE
S.F.
$ 6
$ 4,378
$ -
$ -
$ 4,378
17
4
0208
REMOVING RAISED PAVEMENT MARKER
HUND
$ 185
$ 740
$ -
$ -
$ 740
18
3,292
0220
REMOVING CHAIN LINK FENCE
L.F.
$ 13
$ 42,796
$ -
$ -
$ 42,796
19
I
0254
REMOVING SOLDIER PILE SHAr'r OBSTRUCTIONS
EST.
$ 7,350
$ 7,350
$ -
$ -
$ 7,350
20
1
0256
REMOVING SHAFT OBSTRUCTIONS
EST.
$ 859,095
$ 859,095
$
$
$ 859,095
PREPARATION
$1,407,268
$0
$0
$1,407,268
GRADING
21
12,650
0310
ROADWAY EXCAVATION INCL. HAUL
C.Y.
$ 17.00
$ 215,050,00
$ -
$ -
$ 215,050.00
22
9,315
0421
GRAVEL BORROW INCL. HAUL
C.Y.
$ 11.00
$ 102,465.00
$ -
$ -
$ 102,465.00
23
9,315
0470
EMBANKMENT COMPACTION
C.Y.
$ 2.00
$ 18,630.00
$ -
$ -
$ 18,630.00
GRADING
$ 336,145.00
$ -
$ -
$ 336,145.00
11hMs1.oborn.com1Projecls_FW1FoderalWay120181A18.00051001En01noeringfCost Estimate\Ott Sakai RevievACoal Estmato 0tt Sakai Comparison Enabled_dlslsu 7/9/2018
123
2 of12
Item
No.
Schedule A
Desc
Quantity
Std. Item
No.
Item Description
Unit
Unit
Cost
Schedule A
Desc
Cost
Schedule B
Desc
Cost
Schedule C
Best
Cost
Total
All Schedules
GRADING - UPRR SHOOFLY
24
6,321
XX-0I
SUBBALLAST
TON
$ 21
$ 132,741
$ -
$ -
$ 132,741
25
345
XX-02
TEMPORARY SURCHARGE WALL BLOCK
EACH
$ 30
$ 10,350
S -
$ -
$ 10,350
26
15,368
XX-35
GRAVEL BORROW INCL. HAUL SURCHARGE
TON
S 23
$ 353,464.
$ -
$ -
$ 353,464
27
33.322
0431
GRAVEL BORROW INCL. HAUL
TON
$ 23
$ 766,406
$ -
$ -
$ 766.406
28
7.415
1086
QUARRY SPALLS
TON
$ 16
$ 118,640
$ -
$ -
$ 118,640
29
120
XX-24
LIGHT WEIGHT FILL
CY
$ 150
$ 13.000
$ -
$ -
$ 13,000
30
1,100
XX-33
TEMPORARY SHOOFLY WALL
EACH
$ 30
$ 33,000
$ -
$ -
$ 33,000
31
15
XX-29
4 FT DIAM PRIMARY SHAFT
LF
$ 720
$ 10,300
$ -
$ -
S 10,800
32
16
XX-30
4 FT DIAM SECONDARY SHAFT
LF
$ 450
$ 7,200
$ -
$ -
$ 7,200
GRADING - UPRR SHOOFLY
S 1,450,601.00
$ -
$ -
$ 1,450,601.00
f/f fsl.abam.comfPraJects_FIMFederatWay120181A18.00851001Enginaedng/Cost EstimetelOtt Sakal Reulow1Cost Estimate Ott Sakel Camparlson_Enabled dlxlsx 7/9/2018
124
3 of 12
liana
No.
Schedule A
Desc
Quantity
Sid. hem
No.
Itent.Descriplion
Unit
Unit
Cost
Schedule A
Desc
Cost
Schedule B
Desc
Cost
Schedule C
Desc
Cost
Total
All Schedules
DRAINAGE
31
14,745
7005
STRUCTURE EXCAVATION CLASS B
C.Y.
$ 17
$ 250,665
$ -
$ -
$ 250,665
32
3
1063
COMBINATION INLET
EACH
$ 1,410
$ 4,230
$ -
$ -
$ 4,230
33
10
1075
HEAVY LOOSE RIPRAP
TON
$ 70
$ 700
$ -
$ -
$ 700
34
1,792
1161
UNDERDRAIN PIPE 8 IN. DIAM.
L.F.
$ 12
$ 21,504
$ -
$ -
$ 21,504
35
1,848
3016
HIGH -DENSITY POLYETI-IYLENE(HDPE) PIPE 12 IN. DIAM.
L.F.
$ 32
$ 59,136
$ -
$ -
$ 59,136
36
29
3017
HIGH -DENSITY POLYETHYLENE (HDPE) PIPE 18 IN. DIAM.
L.P.
$ 38
$ 1,102
$ -
$ -
$ 1,102
37
835
3018
HIGH -DENSITY POLYETHYLENE (1-IDPE) PIPE 24 IN. DIAM.
L.F.
$ 263
$ 219,605
$ -
-
$ 219.605
38
36
3091
CATCH BASIN TYPE I
EACH
$ 1,653
$ 59,508
$ -
$ -
$ 59,508
39
13
3105
CATCH BASIN TYPE 2 481N. DIAM.
EACH
$ 3,760
S 48,880
$ -
$ -
$ 48,880
40
1
3107
CATCH BASIN TYPE 2 72 IN. DIAM.
EACH
$ 5,763
$ 5,763
$ -
$ -
$ 5,763
41
1
3109
CATCH BASIN TYPE 2 60 IN. DIAM.
EACH
S 4,975
$ 4;975
$ -
$ -
$ 4,975
42
788
3869
DUCTILE IRON PIPE FOR WATER MAIN 12 IN. DIAM.
L.P.
$ 60
$ 47,280
$ -
$ -
$ 47,280
43
226
3872
DUCTILE IRON PIPE FOR WATER MAIN 18 IN. DIAM.
L.F.
$ 410
$ 92,660.
$ -
$ -
$ 92,660
44
13
3874
DUCTILE IRON PIPE FOR WATER MAIN 24 IN. DIAM.
L.F.
$ 92
$ 1,196
$ -
$ -
S 1,196
45
70
XX-04
36" DIAM. CMP CULVERT PIPE
L.P.
$ 45
$ 3,150
$ -
$ -
$ 3,150
46
I
XX-14
GROUNDWATER PUMP
L.S.
$ 150,000
$ 150,000
$ -
$ -
$ 150,000
47
1
XX-15
EXPAND EXISTING PUMP STATION
L.S.
$ 500,000
$ 500,000
$ -
$ -
$ 500,000
48
I
XX-19
UPGRADE DETENTION POND
L.S.
$ 100,000
$ 100,000
$ -
$ -
$ 100,000
49
I
XX-37
SOUND TRANSIT STORM
L.S.
$ 30,000
$ 30,000
$ -
$ -
$ 30,000
DRAINAGE
$ 1,600,354
$ -
$ -
$ 1,600,354
SANITARY SEWER
50
379
3767
PVC SANITARY SEWER PIPE 8 IN. DIAM.
L.F.
$
40
$ 15,160
$ 15,160
51
XX-20
RELOCATE 36" SEWER
L.S.
$ 1,066,000
$ 1.066,000
$
S
$ 1.066,000
SANITARY SEWER
S 1,081,160
$
$ 1,081,160
WATER LINES
52
3
3850
MOVING EXISTING HYDRANTS
EACH
$ 2,500
5 7,500
$ -
$ -
$ 7,500
53
3
3852
RECONNECTING EXISTING HYDRANTS
EACH
$ 1,850
$ 5,550
$ -
$ -
$ 5,550
SUBTOTAL
$ 13,050
$ -,
$ -
$ 13,050
54
I
TAX
8.80%
$ 1,148
$ -
$ -
$ 1,148
ltt fs1.abam,comlProjects_PMFederalWay120189 18.00851001Englneedng\Coal Esllmalo\Ott Sakai RevlewfCosl Estimala_011 Sakai Compadson_Enabled rifxlsx 719/2010
125
4 of 12
Item
No.
Schedule A
Desc
Quantity
Std. Item
No.
Item Description
Unit
Unit
Cost
Schedule A
Desc
Cost
Schedule 13
Desc
Cost
Schedule C
Desc
Cost
Total
All Schedules
WATER LINES
$ 14,198
$ -
$ -
$ 14,198
STRUCTURE
55
160
4049
SHAFT - 36 IN. DIAMETER
L.F.
$ 200
$ 32,000
$ -
$ -
S 32,000
56
460
4053
FURNISHING SOLDIER PILE
L.F.
$ 250
$ 115,000
$ -
$ -
$ 115,000
57
3,380
4149
ST. REINF. BAR FOR BRIDGE
LB.
$ 1
$ 4,056
$ -
$ -
$ 4,056
58
61,250
4150
ST. REINF. BAR FOR RETAINING WALL
LB.
$ I
$ 73,500
$ -
$ -
$ 73,500
59
20
4322
CONC. CLASS 4000 FOR BRIDGE
C.Y.
$ 400
$ 8,000
$ -
$ -
$ 8,000
60
310
4139
CONC. CLASS 4000 FOR RETAINING WALL
C.Y.
$ 400
$ 124,000
$ -
$ -
$ 124,000
61
1,710
4202
CONC. CLASS 4000 FOR SECANT CAP & STEM WALL
C.Y.
$ 400
$ 684,000
$ -
$ -
$ 684,000
62
60
4202
CONC. CLASS 4000 FOR WALL IMPROVEMENTS
C.Y.
$ 400
$ 24,000
$ -
$ -
$ 24,000
63
38,270
4204
CONC. CLASS 4000W FOR SEAL
C.Y.
$ 169
$ 6,466,108
S -
$ -
$ 6,466,108
64
2,370
4299
LAGGING
S.F.
$ 45
$ 106,650
. $ -
$ -
$ 106,650
t\t5ts1.4bam.com\Projects_FtMFedera1Wa142018A18,00851001Enolneednp1Cost Estimate \Ott Sakai ReviovACast Estlmale_Ott Sakai Comparison Enabled_rlf.xlsx 7/9/2018
126
5of12
Item
No.
Schedule A
Desc
Quantity
Std. Item
Na.
Item Description
Unit
Unit
Cost
Schedule A
Desc
Cost
Schedule B
Desc
Cost
Schedule C
Desc
Cost
Total
All Schedules
65
1
4300
SUPERSTRUCTURE
L.S.
$ 681,056
$ 681,056
$ -
$ -
$ 681,056
66
90
4338
EXPANSION JOINT SYSTEM COMPRESSION SEAL - SUPERSTR.
L.F.
$ 125
$ 11,250
$ -
$ -
$ 11,250
67
110
4456
SCARIFYING CONC. SURFACE
S.Y.
$ 114
$ 12,540
$ -
$ -
S 12,540
68
16
4483
PERMANENT GROUND ANCHOR
EACH
$ 5,000
$ 80,000
$
$ -
$ 80,000
69
16
4484
PERMANENT GROUND ANCHOR PERFORMANCE TEST
EACH
$ 2,000
$ 32,000
$ -
$ -
S 32,000
70
1
4485
PERMANENT GROUND ANCHOR VERIFICATION TEST
L.S.
$ 10,000
$ 10,000
$ -
$ -
$ 10,000
71
87,710
7006
STRUCTURE EXCAVATION CLASS B INCL. HAUL
C.Y.
$ 24
$ 2,105,040
$ -
$ -
$ 2,105,040
72
78,190
7008
SHORING OR EXTRA EXCAVATION CLASS B
S.F.
$ 10
$ 781,900
$ -,
$ -
$ 781,900
73
240
5656
BRIDGE APPROACH SLAB
S.Y.
$ 500
$ 120,000
$ -
$ -
$ 120,000
74
1
XX-21
PEDESTRIAN BRIDGE
L.S.
$ 283,206
$ 283,206
S -
$ -
$ 283.206
75
950
XX-22
WALL FASCIA
CY
$ 1,150
$ 1,092,622
$ -
$ -
$ 1,092,622
76
188.880
XX-23
ST. REINFORCED FOR WALL FASCIA
LB
$ 1
$ 226,656
$ -
$ -
$ 226,656
77
I
XX-25
SHOOFLY BRIDGE
L.S.
$ 660.591
$ 660,591
$ -
$ -
$ 660,591
78
341,640
XX-27
ST. REINFORCED FOR SECANT CAP AND WALL
LB
$ 1
$ 409,968
$ -
$ -
$ 409,968
79
8,190
XX-28
ST. REINFORCED FOR WALL IMPROVEMENTS
LB
$ I
$ 9,828
$ -
$ -
$ 9,828
80
12,130
XX-29
4 FT DIAM PRIMARY SHAFT
LF
$ 784
$ 9,506,807
S -
$ -
$ 9,506,807
81
12,130
XX-30
4 FT DIAM SECONDARY SHAFT
LE
$ 514
$ 6,231,707
$ -
$ -
$ 6,231,707
82
66
4160
QA SHAFT TEST
EACH
$ 2,000
$ 132,000
$ -
$ -
$ 132,000
83
1
XX-36
TEMPORARY STRUTS
L.S.
$ 569,944
$ 569,944
$ -
$ -
$ 569,944
STRUCTURE
$ 30,594,430
$ -
$ -
$ 30,594,430
STRUCTURE - BNSF ROW
84
7,540
4006
STRUCTURE EXCAVATION CLASS A INCL. HAUL
C.Y.
$ 24
$ 180,960
$ -
$ -
$ 180,960:
85
1
4013
SHORING Oft EXTRA EXCAVATION CL. A
L.S.
$ 41,290
$ 41,290
$ -
$ -
S 41,290
86
70
XX-18
PERVIOUS STRUCTURE BACKFILL
CY
$ 30
$ 2,100
$ -
$ -
$ 2,100
87
1
4085
FURNISHING AND DRIVING STEEL TEST PILE
EACH
$ 21,000
$ 21,000
$ -
$ -
S 21,000
88
2,768
4090
FURNISHING ST. PILING
L.F.
$ 100
$ 276,800
$ -
$ -
$ 276,800
89
32
4095
DRIVING ST. PILE
EACH
$ 4,000
$ 128,000
$ -
$ -
$ 128,000
90
50
4202
CONC. CLASS 4000 FOR WALL IMPROVEMENTS
C.Y.
$ 400
$ 20,000
$ -
$ -
$ 20,000
91
1,940
4204
CONC. CLASS 4000W FOR SEAL
C.Y.
$ 155
$ 301,610
$ -
$ -
$ 301,610
92
80
4456
SCARIFYING CONC. SURFACE
S.Y.
$ 114
$ 9,120
$ -
$ -
$ 9,120
93
12
4483
PERMANENT GROUND ANCHOR
EACH
$ 5,000
$ 60,000
$ -
$ -
$ 60,000
94
12
4484
PERMANENT GROUND ANCHOR PERFORMANCE TEST
EACH
$ 2,000
$ 24,000
$ -
$ -
$ 24,000
95
32
8376
FURNISHING STEEL PILE TIP OR SHOE
EACH
$ 2,500
$ 80,000
$ -
$ -
$ 80,000
\\IwfsLab nm.comtProjects_FIMFoderalWayt2018W1o.00851001Enoineenng\Cost EstimatelOtt Sakai Reviee. Cost Estimate O11 Sakai Compartson_Enobled_rlt.xlsx 7/9/2018
127
6 0112
Item
No.
Schedule A
Desc.
Quantity
Std. Item
No.
Item Description
Unit
Unit
Cost
Schedule A
Desc
Cost
Schedule B
Desc
Cost
Schedule C
Desc
Cost
Total
All Schedules
96
51,330
4149
ST. REINF. BAR FOR BRIDGE
LB.
$ 1
$ 61,596
$ -
$ -
$ 61,596
97
6,100
XX-28
ST. REINFORCED FOR WALL IMPROVEMENTS
LB
S l
$ 7,320
S -
$ -
$ 7,320
98
260
4322
CONC. CLASS 4000 FOR BRIDGE
C.Y.
$ 400
$ 104,000
$ -
$ -
$ 104,000
99
7,460
7006
STRUCTURE EXCAVATION CLASS B INCL. HAUL
C.Y.
S 24
$ 179.040
$ -
$ -
$ 179,040
100
750'
7008
SHORING OR EXTRA EXCAVATION CLASS B
S.F.
$ 10
$ 7,500
$ -
$ -
$ 7,500
101
330
XX-29
4 FT DIAM PRIMARY SHAFT
LF
$ 720
$ 237,600
$ -
$ -
$ 237,600
102
330
XX-30
4 FTDIAM SECONDARY SHAFT
LF
$ 450
$ 148,500
$ -
S -
$ 148,500
103
2
4160
QA SHAFT TEST
EACH
$ 2,000
$ 4,000
$ -
$ -
$ 4,000
STRUCTURE - BNSF ROW
$ 1,894,436
$ -
$
$ 1,894,436
STRUCTURE - UPRR ROW
104
13,120
7006
STRUCTURE EXCAVATION CLASS B INCL. HAUL
C.Y.
$ 24
$ 314,880
$ -
$ -
$ 314,880
105
10,890
7008
SHORING OR EXTRA EXCAVATION CLASS B
S.F.
$ 10
$ 108,900
$ -
$ -
$ 108,900
106
50
4087
CONSTRUCTING 6 FT. DIAM SHAFT
L.F.
$ 1,600
$ 80,000
$ -
$ -
S 80,000
107
15,710
4149
ST. REINF. BAR FOR BRIDGE
LB.
$ I
S 18.852
$ -
$ -
$ 18,852
Ilfwlsl.ebom.comtProjects_FW1FoderalWay/20161A18.0085\001EnginearingtCoat Estimateloft Sakai Review/Cost Estimate O11 Sakai Comparison Enabted_rlfxlsx 7/9/2018
128
7of12
Item
No,
Schedule A
Desc
Quantity
Std. Item
No.
Item Description
Unit
Unit
Cost
Schedule A
Desc
Cost
Schedule B
Desc
Cost
Schedule C
Desc
Cost
Total
All Schedules
108
5,110
4204
CONC. CLASS 4000W FOR SEAL
C.Y.
$ 194
$ 989,718
$ -
$ -
$ 989,718
109
80
4322
CONC. CLASS 4000 FOR BRIDGE
C.Y.
$ 400
$ 32,000
$ -
S -
$ 32,000
110
I
4300
SUPERSTRUCTURE
L.S.
$ 619,129
$ 619,129
$ -
$
$ 619,129
III
I
4468
CLEANING AND PAINTING
L.S.
$ 76,000
$ 76,000
$ -
$ -
$ 76,000
112
1
7037
STRUCTURE SURVEYING
L.S.
$ 15,000
$ 15,000
$ -
$ -
$ 15,000
113
2,210
XX-29
4 FT DIAM PRIMARY SHAFT
LF
$ 793
$ 1,751,789
$ -
$ -
$ 1,751,789
114
2,210
XX-30
4 FT DIAM SECONDARY SHAFT
LF
$ 523''
$ 1,155,089
$ -
$ -
$ 1,155,089
115
170
XX-32
D.AMPPROOFING
S.Y.
$ 35
$ 5,950
$ -
$ -
S 5,950
116
120
XX-34
WATERPROOFING
L.P.
$ 30
$ 3,600
$ -
$ -
$ 3,600
117
9
4160
QA SI-IAFT TEST
EACH
$ 2,000
$ 18,000
$ -
$ -
S 18,000
STRUCTURE - UPRR ROW
$ 5,188,907
$ -
$ -
$ 5,188,907
SURFACING
118
119
15,571
7,175
5040
5100
PERMEABLE BALLAST
CRUSHED SURFACING BASE COURSE
TON
TON
$
$
28
23
SURFACING
$ 435,988
$ 165,025
$ 601,013
$
S
$ 435,988
$ 165,025
$ 601,013
HOT MIX ASPHALT
120 1 8,000 1 5767 IHMA CL. 1/2 IN. PG [ TON I $ 84
$ 672,000
$ -
$ -
$ 672,000
HOT MLX ASPHALT
$ 672,000
$ -
$ -
$ 672,000
EROSION CONTROL ANI) ROADSIDE PLANTING
121
4
6409
TOPSOIL TYPE C
ACRE
$ 38,000
$ 152,000
$ -
$ -
$ 152,000
122
16,200
6419
SEEDING AND FERTILIZING BY HAND
S.Y.
$ 1
$ 19,440
$ -
$ -
$ 19,440
123
I
6488
EROSION CONTROL AND WATER POLLUTION PREVENTION
L.S.
$ 100,000
$ 100,000
$ -
$ -
$ 100,000
EROSION CONTROL AND ROADSIDE PLANTING
$ 271,440
$ -
$ -
$ 271,440
TRAFFIC
124
6,47G
6700
CEMENT CONC. TRAFFIC CURB AND GUTTER
L.F.
$ 52
$ 336,752
$ -
$ -
$ 336,752
125
622
6701
CEMENT CONC. TRAFFIC CURB
L.F.
$ 36
$ 22,392
$ -
$ -
$ 22,392
126
134
6707
CEMENT CONC. PEDESTRIAN CURB
L.F.
S 39
$ 5,226
$ -
$ -
$ 5,226
127
607
6727
EXTRUDED CURB
L.P.
$ 17
$ 10,319
$ -
$ -
$ 10,319
128
375
6743
BEAM GUARDRAIL TYPE 1 - 8 FT. LONG POST
L.F.
S 27
$ 10,125
$ -
$ -
$ 10,125
129
2
6760
BEAM GUARDRAIL TRANSITION SECTION TYPE
EACH
$ 4,066
$ 8,132
$ •
$ -
$ 8,132
\lfwfst.obom.com\Projects FW\FoderaiWay2018V118.0085\00lEngineoring\Cost EstimatelOtt Sakai Review\Cost Estimate Oit Sakai Comporisan_Ennbled rlfxlsx 7/9/2016
129
8 of 12
Item
No,
Schedule A
Dose
Quantity
Std. Item
No.
Item Description
Unit
Unit
Cost
Schedule A
Dose
Cost
Schedule B
Desc
Cost
Schedule C
Dese
Cost
Toed
All Schedules
130
6
6766
BEAM GUARDRAIL ANCHOR TYPE 10
EACH
$ 1,000
$ 6,000
$ -
$ -
$ 6,000
131
15,430
6806
PAINT LINE
L.F.
$ 2
$ 23.145
$ -
$ -
$ 23.145
132
967'
6827
PAINTED WIDE LANE LINE
L.F.
$ 0
$ 338
$ -
$ -
$ 338
133
26
6833
PLASTIC TRAFFIC ARROW
EACH
$ 255
$ 6,630
$ -
$ -
$ 6,630
134
950
6857
PLASTIC CROSSWALK LINE
S.F.
$ 14
$ 13,300
$ -
$ -
$ 13,300
135
279
6859
PLASTIC STOP LINE
L.F.
$ 10
$ 2,790
$ -
$ -
S 2,790
136
1
6890
PERMANENT SIGNING
L.S.
$ 7,500
$ 7,500
$ -
$ -
S 7,500
I37
1
6904
ILLUMINATION SYSTEM
L.S.
$ 150,000
$ 150,000
$ -
$ -
$ 150,000
138
1
6912
TRAFFIC SIGNAL SYSTEM
L.S.
$ 893,268
$ 893,268
$ -
$ -
$ 893,268
139
105
6915
CASING
L.F.
$ 100
$ 10,500
$ -
$ -
$ 10,500
140
55
6917
DIRECTIONAL BORING
L.F.
$ 88
$ 4.840
$ -
$ -
$ 4,840
141
I
6971
PROJECT TEMPORARY TRAFFIC CONTROL
L.S.
$ 40,000
$ 40,000
$ -
$ -
$ 40,000
142
4
7442
PERMANENT IMPACT ATTENUATOR
EACI-I
$ 28,575
5 114,300.
$ -
$ -
$ 114,300
143
1
XX-08
PEDESTRIAN CONTROL AND PROTECTION
L.S.
$ 50,000
$ 50,000
$ -
$ -
$ 50,000
TRAFFIC
$ 1,715,557
$ -
$ -
$ 1,715,557
\\hvfsl.obam.com/ProJods_F1MFedera/Wayt2018A18.00B5\00/Engineoring\Cast Estimate \Ott Sakai ReviovACaal Estimalo Ott Sakai Comparison Enabled rifxtsx 7/9/2018
130
90112
Item
No.
Schedule A
Desc
Quantity
Std. Item
No.
Item Description
Unit
Unit
Cost
Schedule A
Desc
Cost
Schedule B
Desc
Cost
Schedule C
Desc
Cost
Total
All Schedules
OTHER ITEMS
144
434
1945
PEDESTRIAN HANDRAIL
L.F.
$ 200
$ 86,800
$ -
$ -
$ 86,800
145
34
3110
LOCKING SOLID METAL COVER AND FRAME FOR CATCH BASIN
EACH
$ 1,075
$ 36,550
$ -
$ -
$ 36,550
146
1
7003
TYPE B PROGRESS SCHEDULE
L.S.
$ 5,000
$ 5,000
$ -
$ -
$ 5,000
147
l
7037
STRUCTURE SURVEYING
L.S.
$ 25,000
$ 25,000
$ -
$ -
$ 25,000
148
I
7038
ROADWAY SURVEYING
L.S.
$ 10,000
$ 10,000
$ -
$ -
$ 10,000
149
6
7041
BOLLARD TYPE
EACH
$ 825
$ 4,950
$ -
$ -
S 4,950
150
2,330
7055
CEMENT CONC. SIDEWALK
S.Y.
$ 46
$ 107,180
$ -
$ -
$ 107,180
151
5
7058
CEMENT CONC. CURB RAMP TYPE
EACH
$ 4,650
,$ 23,250
$ -
$ -
$ 23,250
152
157
7059
CEMENT CONC. DRIVEWAY ENTRANCE TYPE
S.Y.
$ 104
$ 16,328
$ -
$ -
$ 16,328
153
990
7060
ASPHALT CONC. SIDEWALK
S.Y.
S 83
$ 82,170
$ -
$ -
$ 82,170
I54
1,035
7083
CHAIN LINK FENCE TYPE 3
L.P.
$ 17
$ 17,078
$ -
S -
'$ 17,078
155
3
7103
DOUBLE 14 FT. COATED CHAIN LINK GATE
EACI-I
$ 1,600
$ 4,800
$ -
$ -
$ 4,800
156
1
7350
CLEANING EXISTING DRAINAGE STRUCTURE
L.S.
$ 6,000
$ 6,000'
$ -
$ -
$ 6,000
157
II
7360
MANHOLE 48 IN. DIAM. TYPE
EACH
$ 3,740
$ 41,140
$ -
$ -
$ 41,140
158
2
7364
MANHOLE 60 IN. DIAM. TYPE
EACH
$ 5,300.
$ 10,600
$ -
$ -
$ 10,600
I59
I
7480
ROADSIDE CLEANUP
EST.
$ 35.000
$ 35,000
$ -
$ -
S 35,000
160
1
7490
TRIMMING AND CLEANUP
L.S.
$ 5,000
$ 5,000
$ -
$ -
$ 5,000
161
1
7500
FIELD OFFICE BUILDING
L.S.
$ 22,000
$ 22,000
$ -
$ -
$ 22.000
162
9,300
7530
CONSTRUCTION GEOTEXTILE FOR SEPARATION
S.Y.
$ 7
$ 65,100
$ -
$ -
$ 65,100
163
1.206
7559
GEOSYNTHETIC RETAINING WALL
S.F.
$ 15
$ 13,090
$ -
$ -
$ 18,090
164
402
7567
GRAVEL BORROW FOR STRUCTURAL EARTH WALL INCL. HAUL
C.Y.
$ 48
$ 19,296
$ -
$ -
$ 19,296
165
1
7725
REIMBURSEMENT FOR THIRD PARTY DAMAGE
EST.
$ 10,000
$ 10.000
$ -
$ -
$ 10,000
166
I
7728
MINOR CHANGE
CALC
$ 75,000
$ 75,000
$ -
$ -
$ 75,000
167
7731
STEEL COST ADJUSTMENT
CALC
$ -
$ -
$ -
$ -
$ -
168
I
7736
SPCC PLAN
L.S.
$ 2,000
$ 2,000
$ -
$ -
$ 2,000.
169
7
9605
CONNECTION TO DRAINAGE STRUCTURE
EACH
$ 1,640
$ 11,480
S -
$ -
$ 11,480
170
I
01-07
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
L.S.
$ 20,000
$ 20,000
$ -
$ -
$ 20,000
171
l
01-11
UTILITY POTHOLING
L.S.
$ 30,000
$ 30,000
$ -
$ -
S 30,000
172
1
XX-05
DEWATERING SYSTEM
L.S.
$ 250,000
$ 250,000
$ -
$ -
$ 250,000
173
2
XX-06
ABANDONMENT OF MONITORING WELLS
EACH
$ 700
$ 1,400
$ -
$ -
S 1,400
174
1
XX-09
SETTLEMENT MONITORING - SURVEY
L.S.
$ 10,000
$ 10,000
$ -
$ -
$ 10,000
175
26
XX-10
SETTLEMENT PLATES
EACH
$ 800
$ 20.800
$ -
$ -
$ 20,300
1 fwfs1.abarn.com\Projects FW\FederalWsyt2016\A18.0085\00lEnglneeringlCost Estimate \Ott Sakai RecowlCost Esttmale_Ott Sakai Comparison_Enabled rlt.atsx 7/9/2018
131
Item
No,
Schedule A
Desc
Quantity
Std. item
No.
Item Description
Unit
Unit
Cost
Schedule A
Desc
Cost -
Schedule B
Desc
Cost
Schedule C
Desc
Cost
Total
All Schedules
176
1
XX-11'
PROJECT RED LINE DRAWINGS
L.S.
$ 2,000
$ 2,000
$ -
$ -
$ 2,000
177
1
XX-I2
FIBER OPTIC RELOCATION - WEST SIDE
L.S.
$ 60,000
$ 60,000
S -
$ -
$ 60,000
178
1
XX-13
FIBER'OPTICRELOCATION - EAST SIDE
L.S.
$ 130,000
$ 130,000
$ -
$ -
$ 130,000
179
1
XX-31
STORM BYPASS
EST.
$ 15,000
$ 15.000
$ -
$ -
S 15,000
180
I
XX-38
RELOCATE BP GAS LINES
L.S.
$ 1,000,000
S 1,000,000
$ -
S -
$ 1,000,000
OTHER ITEMS
$ 2,279,012
$ -
$ -
$ 2,279,012
Subtotal -Ex. Mobc
Mobilization
Subtotal
$ 49,106,521
$ -
$ -
$ 49,106,521
$ 8,681,105
$ -
$ -
$ 8,681,105
S 57,787.626
$ -
$ -
$ 57,787.62E
10af12
I19,4st.abam.camiProJects_FW\FederatWay2018/A18.0085\00\Englneedng\Cast Estimate/Ott Sakai RovievACest Estimato_oa Sakai Compadson_Enabled drxlss 719/2016
132
110112
Item
No.
Schedule A
Desc
Quantity
Std. hem
No.
Item Description
Unit
Unit
Cost
Schedule A
Desc
Cost
Schedule B
Desc
Cost
Schedule C
Desc
Cost
Total
MI Schedules
Tax 0.00%
$ -
$ -
$ -
$ -
Total Estimated Construction Cost with Mob
$ 57,787,626
$ -
$ -
$ 57,787,626
Design Contingency 5%
Market Conditions 0%
Estimated Construction Bid Cost/Budget (21118 Dollars)
Inllntion Factor (3% per year for 2 years) 3%
Estimated Construction Bid Cost/Budget (2020 Dollars)
Construction Contingency/Risk 10%
Estimated Bid Amount Total
Estimated Track shift by UPRR
UPRR Flagging
UPRR Inspection
BNSF Flagging
BNSF Inspection
BP Design Costs
Estimated Total Construction Costs
$ 2,889,331
S -
$ -
$ 2,889,381
$ -
$ -
S 60,677,007
$ -
S -
$ 60,677,007
S 3,695,230
$ -
$ -
$ 3,695,230
$ 64,372,237
$ -
S -
$ 64,372,237
$ 6,437,223.67
$ -
$ -
$ 6,437,224
$ 70,809,460
S -
$ -
$ 70,809,460
$ 682,000
$ 682,000
$ 720,000
$ 720,000
S 120,000
$ 120,000
$ 540,000
$ 540,000
$ 120,000
$ 120,000
$ 570,000
$ 570,000
$ 73,561,460
$ 73,561,460
\\twfsl.abam.com\Projects FW\FederalWay12018W18.0085100tEngineedng\Cost Estimate\Ott Sakai RevleeACaal Eslimate Ott Sokal Camparlson Enabled_rlfxlso 7/9/2018
133
129112
Item
No,
Schedule A
Desc
Quantity
Sal, hem
No.
ttent Description
Unit
Unit
Cost
Schedule A
Dose
Cost
Schedule B
Desc
Cost
Schedule C
Desc
Cost
Total
All Schedules
Estimated ROW & Easement (Misc. Properties) Costs
Estimated Engineering & Permitting Costs
Estimated Owner/Agency Design Engineering Costs
Estimated Construction Admin and Inspection Costs
Estimated Total Project Costs
$ 1,720,166
$ 1,720,166
$ 3,892,500
$ 3,892,500
$ 607,500
$ 607,500
$ 4,000,000.00
$ 4,000,000
S 83,781,626
$ 83,781,626
ROW & EASEMENTS
1
ROW Acquisition (Past Food Restaurants)
EST.
$ 191,925
$ -
S -
$ 191,925
1
Permanent Easements (BP, KC Sewer, outfall, fast food driveways)
EST.
$ 447,000
$ 447,000
Temporary Construction Easements (BP, KC Sewer, outfall, fast food driveways)
EST.
$ 668,241
$ 668,241
I
Estimated UPRR Penn & Temp Easements
EST.
$ 330,000
S -
S -
$ 330,000
1
Estimated BNSF BP & KC Sewer Easements
EST.
$ 83,000
$ -
$ -
$ 83,000
Subto al - ROW &Easements
$ 1,720,166
'$ -
$ -
$ 1,720,166
11fwfs1.abam.wm5ProJocts_FW1FederalWay12018W18.0085\5t\EigineeringtCos1 Estimate \Ott Sakai ReviewtCast Estimate Ott Sakai Comparison Enabled_dr.nlsx 7/9/2018
134
Transportation & Infrastructure Committee Minutes November 13, 2018
D. Consultant Agreement: Strander Boulevard Extension Phase 3
Staff is seeking Council approval to move forward with a Value Engineering consultant
contract in an amount not to exceed $75,000. Three firms have responded to the RFQ with
interviews forthcoming, and Council is being asked for approval now due to time
limitations. The project overall continues to have a funding gap of $64M. Advocacy efforts
will be made for inclusion of the project in a possible State transportation package.
Representatives from the Transportation Improvement Board recommended the City
complete Value Engineering as a critical funding strategy. Committee members discussed
the project and expressed support for completing Value Engineering as more will be known
in 2019 regarding overall project funding. UNANIMOUS APPROVAL. FORWARD TO
NOVEMBER 19, 2018 REGULAR CONSENT AGENDA.
E. Resolution: Neighborhood Traffic Calming Program
Staff is seeking Council approval of a resolution that would adopt a Neighborhood Traffic
Calming Program that will provide a predictable and equitable process by which residents
can request improvements. The proposed budget currently includes $400,000 which will
be shared between traffic calming efforts and other safety improvements identified
proactively by staff. The Program distinguishes between types of improvements as Level I
or Level II. Level I includes passive treatments that can be implemented quickly. Level II
includes physical devices that usually require permanent installation and must be
coordinated with Police, Fire, and Council. The Program outlines the request process,
preliminary evaluation, solution alternatives, funding, design, construction, evaluation,
and removal. Councilmembers discussed the proposal. Councilmember Idan stated he
likes the education piece, request process, and levels of response, but feels the
requirement of 70% approval by the neighborhood for Level II improvements is too great
of a barrier for participation. Staff believes the neighborhood approval is needed so the
City knows the investment is truly wanted by the affected residents and not just by a
"squeaky wheel." Councilmember Quinn mentioned that he had researched policies in
other cities and it is common to have a neighborhood approval mechanism. He likes that it
engages the community about the city's investment and provides additional
documentation to support a consistent process. The policy provides flexibility on the
mailing of ballots, since it may be possible to gauge sufficient interest at a community
meeting. Councilmembers discussed the importance of public outreach about the
program, including translations. Chair McLeod suggested reducing the approval threshold
from 70% to 2/3, and the Committee agreed, although Councilmember Idan asserted he
would prefer that the City use a system that would provide the neighborhood an
opportunity for protest rather than majority approval. Staff mentioned that this is a new
policy for the City and adjustments can be made after lessons learned. Councilmember
Idan asked if a resident could submit a new request after already having one fulfilled by the
City. The proposed policy does not limit the number of requests that can be made by an
individual or group. The Committee expressed concern about overuse of the program
creating inequity among neighborhoods and requested language that would restrict new
submissions with a certain time period. UNANIMOUS APPROVAL AS AMENDED. FORWARD
TO NOVEMBER 26, 2018 COMMITTEE OF THE WHOLE.