City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Reg 2018-12-03 Item 4G - Contract Amendment #6 - East Marginal Way South Stormwater Outfalls Final Design and Construction Management with KPG Inc for $263,508
COT-City
>
City Clerk
>
Council Agenda Packets
>
2018 Council Agenda Packets
>
2018-12-03 Regular
>
Reg 2018-12-03 Item 4G - Contract Amendment #6 - East Marginal Way South Stormwater Outfalls Final Design and Construction Management with KPG Inc for $263,508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 2:56:47 PM
Creation date
11/29/2018 2:56:19 PM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
12/03/18
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNCIL AGENDA SYNOPSIS <br /> ILA <br /> <714 ITEM No. <br /> 1, 14 Meeting Date Prepared by Megor's rens Council review <br /> 4. G . <br /> 290 <br /> ITEM INFORMATION <br /> STAFF SFoNsoR: HENRY HASH ORIGINAL AGENDA DATE: 12/03/18 <br /> AGENDA ITEm TrriE Surface Water Fund - East Marginal Way South Stormwater Outfalls <br /> Approve Contract No. 14-010 Amendment No. 6 with KPG, inc <br /> CATEGORY [1] Discussion [g] Motion El Resolution El Ordinance 111 Bid Award El Public Hearing El Other <br /> Mtg Date Mtg Date 12/03/18 Mtg Date Mtg Date Mtg Date Mtg Date Mg Date <br /> SPONSOR El Council LIMayor EIHR HDCD LIFinance El Fire EITS EIP&R 0Po/ice ORIF EICourt <br /> SPONSOR'S KPG is currently the design consultant for the East Marginal Way South Stormwater <br /> SUMMARY Outfalls Project with Contract No. 14-010. Final design services are needed to prepare the <br /> construction bid documents and once under construction, construction management <br /> support. KPG was selected as the most qualified consultant. Council is being asked to <br /> approve Admendment No. 6 for final design and construction management services with <br /> KPG in the amount of$263,508.00. <br /> REVIEWED BY LI C.O.W. Mtg. LI CDN Comm El Finance Comm. 111 Public Safety Comm. <br /> [E] Trans &Infrastructure El Arts Comm. El Parks Comm. [1] Planning Comm. <br /> DATE: 11/26/18 COMMITTEE CHAIR: THOMAS MCLEOD <br /> RECOMMENDATIONS: <br /> SPoNsoR/ADmIN. Public Works Department <br /> Commn-rm Unanimous Approval; Forward to Consent Agenda <br /> COST IMPACT / FUND SOURCE <br /> EXPINDITLIRE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED <br /> $263,508.00 $271,000.00 <br /> Fund Source: 412 SURFACE WATER <br /> Comments: Proposed 2019 CIP,page 92 <br /> MTG. DATE RECORD OF COUNCIL ACTION <br /> 12/03/18 <br /> MTG. DATE ATTACHMENTS <br /> 12/03/18 Informational Memorandum dated 11/21/18 <br /> KPG's Contract No. 14-010, Amendment No. 6 <br /> Minutes from the Transportation and Infrastructure Committee 11/26/18 <br /> 135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.