City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Reg 2018-12-03 Item 4G - Contract Amendment #6 - East Marginal Way South Stormwater Outfalls Final Design and Construction Management with KPG Inc for $263,508
COT-City
>
City Clerk
>
Council Agenda Packets
>
2018 Council Agenda Packets
>
2018-12-03 Regular
>
Reg 2018-12-03 Item 4G - Contract Amendment #6 - East Marginal Way South Stormwater Outfalls Final Design and Construction Management with KPG Inc for $263,508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 2:56:47 PM
Creation date
11/29/2018 2:56:19 PM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
12/03/18
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,J�""+N 1LAry hAi' <br /> Ci i %' Allan Ekberg, Mayor <br /> cr <br /> 4A Public Works Department-Henry Hash, Director <br /> INFORMATIONAL MEMORANDUM <br /> TO: Transportation and Infrastructure Committee <br /> FROM: Henry Hash, Public Works Director AO. <br /> BY: Ryan Larson, Senior Program Manager <br /> CC: Mayor Ekberg <br /> DATE: November 21, 2018 <br /> SUBJECT: Surface Water Fund- East Marginal Way South Stormwater Outfalls <br /> Project No.91041204, Contract No. 14-010 <br /> Contract Amendment No. 6 <br /> ISSUE <br /> Execute Contract Amendment No, 6 to Contract No. 14-010 with KPG for final design and construction management. <br /> BACKGROUND <br /> Drainage along the northern portion of East Marginal Way South is conveyed to the Duwamish River through four separate <br /> outfalls. The outfalls are owned by Jorgensen Forge, the City of Tukwila, and two by the King County International Airport. The <br /> Jorgensen Forge outfall was abandoned in 2012 under an order from the Environmental Protection Agency(EPA)and flows have <br /> been temporally diverted to a King County Airport outfall. <br /> The current consultant contract with KPG developed the 90% plans and design report to divert surface water discharges from <br /> the Jorgensen Forge drainage to the Boeing Z Line outfall. This requires a new conveyance system along East Marginal Way <br /> South that includes a small pump station, installation of pervious pavement within the two way left turn lane, lining a section of <br /> existing outfall pipe, and installing water quality treatment. <br /> DISCUSSION <br /> The East Marginal Way S Stormwater Outfall project has been on hold since 2016 following the loss of final design and <br /> construction grant funding. The grant funding has now been restored and the project can proceed with final design and <br /> construction. KPG completed design through the 90%level and Amendment No. 6 will finish the design and provide construction <br /> management services during construction. Staff has been satisfied with KPG's work on this project as well as other projects that <br /> they have completed construction management services. <br /> FISCAL IMPACT <br /> KPG has prepared the attached contract, scope of work, and fee estimate to complete design and provide the necessary <br /> construction management services. The CIP budget has $75,000 for design that has not been expended and the 2019 CIP has <br /> $271,000 budget for construction management. <br /> Amendment No 6 2019 Proposed CIP <br /> KPG Amendment No. 6 $263,508.00 $271,000.00 <br /> The original contract for the design report and the 90%engineering was for$139,593.72. The new contract total of$403,101.72 <br /> now includes full design and construction management services. <br /> RECOMMENDATION <br /> Council is being asked to authorize the Mayor to execute Contract Amendment No. 6 to Contract No. 14-010 in the amount of <br /> $263,508.00 for the East Marginal Way Stormwater Outfall Project and consider this item on the Consent Agenda at the <br /> December 3, 2018 Regular Meeting. <br /> ATTACHMENTS <br /> KPG Contract No.14-010,Amendment No.6 <br /> W:\PW Eng\PROJECTS\A-DR Projects\East Marginal Way Stormwater Outfalls(91041204)\KPG\Info Memo KPG Sup 6 gl.docx 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.