Laserfiche WebLink
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br /> 2019 to 2024 <br /> PROJECT: Tukwila International Blvd Channelization Study Project No. 81710404 <br /> DESCRIPTION: Study the traffic impacts of various rechannelization options to support the Tukwila International Boulevard <br /> neighborhood vision in the Comprehensive Plan. <br /> Any rechannelization of TIB will have impacts to the boulevard and the surrounding area. The study will look at <br /> JUSTIFICATION: what the impacts are,ways to mitigate any negative impacts, alternative options available to balance needs <br /> of competing interests, and analyze cost ranges for any changes and mitigations. <br /> STATUS: New project for 2019-2024 CIP. <br /> MAINT. IMPACT: None. <br /> Preliminary study identified significant impacts to residential streets with conversion to only three travel lanes. <br /> COMMENT: This 2019 study will build on that preliminary study.This study is related to the implementation of zoning <br /> changes recommended in the 2017 CNU report for the Tukwila International Blvd area. <br /> FINANCIAL Through Estimated <br /> (in$000's) 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL <br /> EXPENSES <br /> Study 100 100 <br /> Land (R/W) 0 <br /> Const. Mgmt. 0 <br /> Construction 0 <br /> TOTAL EXPENSES 0 0 100 0 0 0 0 0 0 100 <br /> FUND SOURCES <br /> Awarded Grant 0 <br /> Proposed Grant 0 <br /> Mitigation Actual 0 <br /> Traffic Impact Fees 0 <br /> City Oper. Revenue 0 0 100 0 0 0 0 0 0 100 <br /> TOTAL SOURCES 0 0 100 0 0 0 0 0 0 100 <br /> m. ViV '^ Dui <br /> Project Location , :° < S 12a� ` �' <br /> S 130 St. N <br /> Ilk <br /> 1. <br /> 1 t.1 �\�� ' �� W A E <br /> UV <br /> °� �P� <br /> ,. 4 );., <br /> I �l , liaLlA_, 9139 w��� g <br /> 0 <br /> m �, � D u wmx.vVm,rvyVy®0 <br /> � co y ' s1e3St <br /> �' <br /> I <br /> � 21 ill, Iy 8144 St i tnm T .�� <br /> 70.4 <br /> ♦ <br /> X Eiv i 47 SI :. <br /> 7 „ `� W .a <br /> / I Cyr L •.q ; G�'a <br /> S 158 St -- VCR '�'► '. GIS <br /> mo o U� �� �t <br /> 244 2019-2024 Capital Improvement Program 21 <br />