City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2011-09-22 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2011-09-22 Planning Commission - ReHabitat Northwest / Southcenter Plan Briefing
>
Planning 2011-09-22 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 4:04:08 PM
Creation date
9/15/2011 3:56:43 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
09/22/11
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
be developed as part of the cottage housing project. Two driveways onto North 14(0 Street will remain, one to access the <br />church and the other to access the new development and the church. <br />Surrounding Land Uses <br />The project is in the Cascade View Neighborhood; this area was annexed into the City in 2(_)(_)(_). Militaiv Road and the frontage <br />improvements along Militaiv Road define the west side of the property and are under the City of SeaTac's jurisdiction. To the <br />northwest of the property- is a vetermaiv clinic with boarding facilities. Cascade View Elementaiv is directly north of the property_ <br />The Riverton Crest Cemeteiy is to the east. South 140 Street defines the southern boundary. A walking path to the Cascade <br />View Elementaiv School runs along the east side of the property-. <br />PUBLIC COMMENTS <br />Prior to the approval as a demonstration project, a public meeting was held on May 8 2007, to gather community input. The <br />concerns included "appearance, maintenance of open space, lack of sidewalks, increased traffic, parking requirements, issues <br />with the carriage house, control on converting to rental units, safety in the neighborhood and controlling the number of people <br />in the units." The Citv_ of SeaTac commented and has jurisdiction over frontage improvements including access on Militai v <br />Road. <br />After the application for the Design Review was filed, a second connnunity meeting was held on Febnuaiv 4, 2009- The meeting <br />,vas well attended and many connnents were received during the public meeting. The concerns included traffic and access on 14(_) <br />and Militai Road; potential storm drainage issues; maintenance and the role of Covenants, Conditions, and Restrictions versus <br />code enforcement; design and appearance of the homes; noise from the adjacent veterinary clinic; and owner- occupied versus <br />rental ratio. Three letters were received from the concerned citizens and are included as Attachment K. The applicant made design <br />changes and has submitted CC &R's that address some of the comments received. The CC &R's are included as Attachment J. <br />The proposed storm drainage design, frontage improvements, and off -site traffic impacts have been reviewed by the Public Works <br />department and the proposal conforms to the city standards and will be discussed as part of this staff report. Civil plans prepared <br />by Pace Engineering, dated June 2010, were also reviewed as part of the subdivision review process (File L0)8 -052). The concerns <br />that are within the scope of the Design Review and the Preliminaiy Subdivision are addressed in this staff report. Other issues, such <br />as noise and property maintenance, are subject to City Ordinances and are not specific to this project. <br />King Count Metro and the City of SeaTac also provided written conmients -,yhich ,sere incorporated into the project. Their <br />connuents are included in Attachment R. Permits from the City of SeaTac will be necessaiv for frontage and work within the right <br />of way. Coordination with the City of SeaTac will continue during the construction phase. <br />REPORT ORGANIZATION <br />This staff report is divided into two sections. The first section covers the Design Review decision to be made by the Board of <br />Architectural Review the second section covers the Subdivision Preliminaiy Plat decision to be made by the Planning <br />Commission. Staffs conclusions and recommendations follow each section. <br />SECTION ONE DESIGN REVIEW <br />REVIEW CRITERIA <br />Design Review approval is subject to the Housing Options Prograni Decision Criteria as set forth in TMC 18.120.050C, the <br />Multi Family, Hotel and Motel Design Review Criteria, and the City of Tukwila Comprehensive Plan. <br />Below is the staff analysis and response. <br />Stacy- MacGregor Pa 5 of 19 09 142011 <br />H: a Cottages at Riverton BAR Staff Report.doc 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.