Laserfiche WebLink
Attachment B <br />Southcenter Subarea Planning Process <br />2002 -2004 Development of the Vision for the Urban Center <br />Council Briefing <br />6 Public Workshops See 9118108 Memo for Summaries <br />2 Joint PC /CC Worksessions <br />Multiple Team Meetings with City Staff Consultants <br />2004 Endorsement of the Vision by CC and PC <br />Joint PC /CC Meeting Directed Team to prepare regulations that implement <br />the Vision <br />Adoption of Updated Comprehensive Plan Policies <br />2005 -2008 Development of the Plan to Implement the Vision <br />Staff review of Draft Plan by Freedman, Tung Bottomley (FTB <br />Urban Land Institute Technical Advisory Panel Worksession on the <br />Implementation Aspects of the Draft Plan <br />Meetings with Local and Regional Developers to Review Plan Direction <br />"Testing" draft regulations on Proposed Developments (Mall expansion, Baker <br />Blvd Retail, Fidelity Bank of A merica, other office retail projects <br />Grant Funding for Pedestrian Bridge Study <br />Sounder Station Review <br />Coordination on Tukwila Pond Park Master Plan <br />Grant and Developer Funding for Transit Center Design and Construction <br />2008 Affirmation of the Vision and Introduction to the Plan <br />Public Open House with FTB 10123108 <br />Joint PC /CC Worksession with FTB 10123108 <br />2008 -2009 Public Outreach for the Plan <br />Presentation to the SWKC Chamber of Commerce 1017108 <br />Presentation to the Parks Commission 11119108 <br />Mailings Emailings to 1400 Property Owners, Tenants, Interested Parties <br />Public Open House 314109 <br />Meetings with Multiple Property Owners <br />Hazelnut Article <br />2009 Review of the Plan Specifics by PC <br />Presentation by FTB 3112109 <br />Public Hearings 3126109, 4123109, 5128109 <br />H: X, attachment B Plan Process Attachment B <br />95 <br />