City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2011-09-22 Items 4-5 - ReHabitat Northwest - Attachment J - Declaration of Covenants, Conditions and Restrictions of Record
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2011-09-22 Planning Commission - ReHabitat Northwest / Southcenter Plan Briefing
>
Planning 2011-09-22 Items 4-5 - ReHabitat Northwest - Attachment J - Declaration of Covenants, Conditions and Restrictions of Record
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 4:04:08 PM
Creation date
9/15/2011 4:53:51 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
09/22/11
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 1. General Requirements. Prior to the clearing of any lot, approval of the Architectural <br />Committee must be obtained for the removal of trees. <br />Prior to commencement of any construction, clearing or site work, plans and specifications for all <br />structures and improvements within the Riverton Cottages must be first submitted to RIVERTON <br />COTTAGES or its duly appointed Architectural Committee for written approval as to the nature and <br />quality of the proposed workmanship and materials, harmony of external design, size, orientation and <br />location with respect to natural surroundings and existing structures; location with respect to <br />topography and finish grade elevation; height; impact upon view from neighboring properties; and <br />conformity with the general plan for development of Riverton Cottages with due regard to preservation <br />of trees. Proposed tree removal is to be included with all submissions. <br />In reviewing such plans and specifications, RIVERTON COTTAGES and the Architectural Committee shall <br />recognize that there can be an infinite number of architectural concepts and ideas for development. <br />RIVERTON COTTAGES shall encourage the formulation of such concepts and ideas. Nevertheless, for the <br />protection of all owners, RIVERTON COTTAGES and the Architectural Committee shall make certain any <br />improvement or structure will be consistent with the existing architecture and harmony of the Riverton <br />Cottages. All construction must conform with County building codes. <br />Section 2. Committee Make -Up and Authority. An Architectural Committee shall be appointed by the <br />Board of Directors. There shall be no less than three (3) members. The Architectural Committee will <br />serve at the pleasure and direction of the Board. Except as otherwise provided herein, a majority, but <br />not less than three (3) members, shall have the authority to act on behalf of the committee without the <br />necessity of a meeting and without consulting the remaining members of the committee. <br />Section 3. Architectural Requirements and Guidelines. The Board of Directors shall approve and publish <br />architectural requirements and guidelines, applicable to construction, clearing and site work within the <br />Riverton Cottages. Said publication shall include specifications, as set forth herein. Also included will be <br />such additional requirements as may be necessary to create a consistence and harmony in the <br />community as to exterior design, size, orientation and location with respect to natural surroundings and <br />existing structures; location as to topography and finish grade elevation; height; impact upon view from <br />neighboring properties; and preservation of trees. <br />Section 4. Application and Building Plans. Plans and specifications must accompany an application for <br />construction of all structures and improvements (including the addition of fixtures to a member's house, <br />outbuilding or property) and must be submitted to the Architectural Committee prior to construction for <br />the committee's written approval. There will be no verbal approvals or agreements. Requirements for <br />application and necessary accompanying documents shall be determined by the Architectural <br />Committee. The applicant will be informed in writing of the decision of the committee. <br />The Architectural Committee shall have thirty (30) days from the date of receipt of the completed plans, <br />specifications and application, to approve or reject the same. In the event no such action be taken by <br />the committee within said thirty- (30) day period, then such plans and specifications shall be deemed to <br />have been approved by the committee. A like requirement shall apply in the case of the filing of revised <br />57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.