City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Reg 2019-01-22 Item 7C - Report - City Administrator
COT-City
>
City Clerk
>
Council Agenda Packets
>
2019 Council Agenda Packets
>
2019-01-22 Regular
>
Reg 2019-01-22 Item 7C - Report - City Administrator
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 4:32:52 PM
Creation date
1/17/2019 4:31:56 PM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
01/22/19
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Administrator's Report <br />January 16, 2019 <br />Page 2 <br />Project Updates <br />• 42nd Ave Phase III: Estimated Completion: February 2019 <br />Seattle City Light (SCL) has three more private service connections to be completed for the <br />overhead to underground utility conversion process. Once complete SCL will start removing <br />the overhead power lines and topping the utility poles. Due to the recent storm damage, <br />Comcast has delayed their overhead wire removal to January 18. After all other utilities have <br />completed their overhead to underground utility conversions, CenturyLink will remove their <br />remaining overhead wires and the utility poles and the contractor will complete the sidewalk <br />installation, illuminate the street poles, and finish the other punch list items. <br />• 53rd Ave S: Estimated Completion: March 2019 <br />The contractor is finalizing electrical services to residences as well as utility work related to <br />installing a PSE gas line. It is anticipated that the base lift of paving will be installed in the first <br />quarter of 2019. <br />• BAR Bridge Rehabilitation: Estimated Completion: March 2019 <br />Contractor continues to work on the sidewalk over the railroad and is anticipating <br />completion by the second week of January. The contractor anticipates shifting the traffic <br />lanes in late January to complete incidental expansion joint work. Construction is on <br />schedule for completion in March. <br />• Strander Blvd Ext Phase 3: Design continues. Staff anticipates the contract with MENG <br />Analysis will be signed this week and the value engineering study wilt commence by the end <br />of January. <br />• Traffic Calming/Residential Safety: Public Works Maintenance has received the driver <br />speed feedback signs and other radar activated LED enhanced signs for use with the <br />program. Installation will begin as the schedule allows. <br />• Tukwila Village: On January 8 Economic Development Administrator Derek Speck provided <br />an update on Tukwila Village to the Tukwila Library Advisory Board. Work has begun on <br />Building A, with construction cranes erected and footings placed. <br />Boards and Commissions <br />• Arts Commission: No vacancies. <br />• Civil Service Commission: No vacancies. <br />• COPCAB: Vacant Position: School District Representative and Student Representative. <br />• Equity & Social Justice Commission: Vacant Position: Student Representative. <br />• Human Services Advisory Board: Vacant Position: Position #3 Resident. <br />• Landmark Commission: No vacancies. <br />• Library Advisory Board: Vacant Positions: Position #7 Resident & Student Representative. <br />• Lodging Tax Advisory Committee: No vacancies. <br />• Park Commission: Vacant Positions: Position #4 Resident & Student Representative. <br />• Planning Commission: No vacancies. <br />Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.