Allentown/Duwamish/Foster Point Projects and Expenditures 1989-2019
<br />1989 Annexed into the City, took over Water District 25 and Fire District 1
<br />1993 King County Metro Sewer Capacity line
<br />1994 EMW Water, served fire flow and water pressure in Allentown
<br />1996 Allentown Water/Sewer/SWM Sewer Phase I
<br />1996 Tukwila Community Center built
<br />1996 Street Improvements, curb, gutter, sidewalk on S 124th St to 42nd Ave S
<br />1997 1997 Small Drainage Project Site 4 - S 124th St/51st Place 5
<br />1998 1998 Small Drainage Project Site 5 - 43rd Ave S
<br />1999 1999 Small Drainage Project Site 3 - 5 129th St
<br />2001 Duwamish Improvements Water & SWM
<br />Included sidewalks and No Parking, PWTF loan 2002 to 2021
<br />(Valley View spent $1,047,148.70 for a total of $2,115,580.63)
<br />2005 2005 Small Drainage Project Site 1- 45th Ave S
<br />2007 2007 Small Drainage Project Site 2 - S 116th St
<br />2007 2007 Small Drainage Project Site 5 - 47th Ave S
<br />2007 Allentown/Foster Point Water/Sewer/SWM Sewer Phase II
<br />Sidewalks on 42nd Ave S and guardrail on river
<br />2009 Allentown Storm Water Pump Station
<br />2011 2010-11 Small Drainage Project Site 4 - 44th Ave. S.
<br />2011 2010-11 Small Drainage Project Site 6 - 5 122nd St - Pipe Lining
<br />2017 42nd Ave S Roadside Barriers (wood barrier along river)
<br />2017 Overlay and Repair on S 124th St
<br />2014-2016 BNSF Intermodal Access Study
<br />2016-2018 S 119`h St Ped Bridge (repair failing girder tops & non-skid deck)
<br />2018 42nd Ave Bridge load ratings & truck checks for BNSF and Baker Commodities
<br />2003-2018 Duwamish Hill Preserve
<br />2006-2018 Duwamish Gardens
<br />$ 7,500,000.00 W/S/SWM 96-WT01
<br />$ 4,100,000.00 Buildings
<br />500,000.00 Roads
<br />20,000.00 Surface Water
<br />40,000.00 Surface Water
<br />20,000.00 Surface Water
<br />$ 1,068,431.93 W/S/SWM 01-WT01
<br />60,000.00 Surface Water
<br />100,000.00 Surface Water
<br />150,000.00 Surface Water
<br />$ 2,274,384.47 Water
<br />5,431,368.81 Sewer 01-SW02
<br />1,071,541.38 Surface Water 01-DRO1
<br />$ 8,777,294.66
<br />$ 421,129.00 Surface Water
<br />$ 174,636.00 Surface Water
<br />$ 94,800.00 Surface Water
<br />$ 192,531.95 Roads 91310301
<br />Roads
<br />$ 241,000.00
<br />120,000.00 Bridges
<br />50,000.00 Bridges
<br />$ 411,000.00
<br />Subtotal $ 23,629,823.54
<br />$ 3,673,915.33 Parks
<br />$ 5,611,661.02 Parks
<br />Total with Parks $ 32,915,399.89
<br />Future
<br />2020 BRAC grant will be applied for to replace existing 42nd Ave S/Allentown Bridge $ 15,750,000.00
<br />90330109
<br />90630102
<br />W:\Shared Copy Only \GaiI\Allentown Projects 1989-2019 g1022119xls,
<br />
|