Laserfiche WebLink
expense, including any additional trench width or depth attributable to errors in <br />the District's design. Any changes to the District Work perceived as necessary by <br />the Contractor and any required change orders must be approved in writing by <br />the District in advance of such changes. <br />3.9 The District shall maintain continued coordination with the City regarding the <br />performance of the District Work. This coordination shall include but not be <br />limited to the following: <br />a. The District will attend the Project pre- construction meeting. <br />b. The City will provide the District a copy of the Contractor's proposed work <br />schedule showing date, location, and extent of work to be performed. This <br />schedule will be subject to change at any time. <br />c. The District will attend weekly construction meetings that involve the District <br />Work. <br />4. CITY RESPONSIBILITIES <br />4.1 The City shall be the lead agency for the Project with regard to design, <br />construction, SEPA review, permitting, inspection, contract administration, <br />funding and all other matters pertinent to accomplishment of the Project. <br />4.2 With the assistance of CH2M, the City shall prepare, advertise, and award the <br />contract bid documents, which shall contain five bidding schedules, three for the <br />City improvements, one for Valley View Sewer District sewer line relocation, and <br />one for the District Work. The basis for Project award will be the total lowest <br />responsible bid for the sum of all five bid schedules. Prior to advertisement, the <br />City shall obtain the District's review and approval of the bid documents. The bid <br />documents, and the advertisement of them, shall comply with City's bid statutes, <br />ordinances and resolutions. <br />4.3 The City shall be responsible for providing all traffic control associated with the <br />construction of the Project. <br />4.4 The City shall require the Contractor to install and perform the District Work in <br />accordance with the Project's final plans, and the District's standards, <br />specifications, and inspector's written direction. <br />4.5 The City will provide written notification to the District at least five (5) days prior to <br />beginning construction of the District Work to allow for District scheduling of the <br />on -site inspector. <br />4.6 The City will schedule and attend weekly construction meetings with the City's <br />Contractor, District, and other franchise utilities involved in the Project. <br />4.7 The City shall require the Contractor constructing the Project to have the District, <br />its elected and appointed officers, agents and employees (collectively, the <br />"District" for the purposes of this provision) named as an insured on all policies of <br />W: \PW Eng \PROJECTS\A- RW & RS Projects\42nd Ave S Phase 111 (99410303 94 -RS03) \Design \90 %\COT - KCWD #125 - Interlocal Agreement <br />42nd Ave S Final.docx -3- <br />