City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Reg 2019-04-01 Item 4C - Contract - 2019 Annual Small Drainage Program with KPG Inc for $78,984
COT-City
>
City Clerk
>
Council Agenda Packets
>
2019 Council Agenda Packets
>
2019-04-01 Regular
>
Reg 2019-04-01 Item 4C - Contract - 2019 Annual Small Drainage Program with KPG Inc for $78,984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 4:52:09 PM
Creation date
3/28/2019 4:52:05 PM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
04/01/19
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project horizontal and vertical datum will be assumed on all sites. No topographic survey or right of way <br />work is anticipated for the CIPP lining projects. <br />The Consultant shall prepare an easement document, legal description, and exhibit for Site 2. The City will <br />perform negotiations to obtain signature and record the easement. <br />The Consultant shall prepare a SEPA checklist and HPA application where required. A building permit <br />will be acquired for the access and safety projects if required. No additional permits are anticipated. <br />It is the Consultants understanding that none of the 2019 Small Drainage Program sites require biological <br />assessments, additional permits beyond those listed, wetland delineations, geotechnical review, detention <br />facilities, or water quality treatment facilities. The budget assumes a straightforward approval process with <br />no special studies or extensive coordination. Aside from Site 2, all work will be completed within City <br />rights of way or easements and no easement acquisition is anticipated. <br />SCOPE OF WORK <br />TASK 1— 2019 Small Drainage Program Design <br />1.1 MANAGEMENT/COORDINATION/ADMINISTRATION <br />• The Consultant shall provide continuous project management and administration for the <br />duration of the Project. (Estimate 4 months). <br />• Hold project coordination meetings with the City to update progress and review submittals. <br />Assume (3) meetings. <br />• The Consultant shall provide monthly status reports and billings. <br />• The Consultant shall provide independent QA/QC reviews by senior in-house staff of all <br />deliverables prior to submittal to the City. <br />1.2 Previously obtained mapping for sites 1 - 3 will be utilized for those sites and supplemented with <br />additional topographic survey as required. Aerial base maps will be utilized for sites 4-8. <br />1.3 For Site 1, the Consultant shall work collaboratively with City staff to determine the preferred <br />alternative to improve safety and access. Final structural design for the preferred alternative will be <br />completed by a subconsultant licensed to practice structural engineering in the State of Washington. <br />The Consultant shall include final civil and structural plans and specifications in the Bid Documents. <br />1.4 For Site 2, the Consultant shall prepare a 50% layout for proposed improvements as well as necessary <br />easement and legal descriptions. The City will review the project and easement needs to obtain <br />approval from the property owner. The Consultant shall make necessary revisions to design approach <br />and easement needs to obtain the approval and include the final design in the Bid Documents. <br />1.5 The Consultant has previously prepared designs for site 3. This site shall be field reviewed to confirm <br />no significant changes that would affect project design. Minor updates and revisions are anticipated, <br />and will be included in the Bid Documents. <br />City of Tukwila <br />2019 Small Drainage Program Page 2 of 4 <br />KPG <br />March 2019 <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.