City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Reg 2019-04-01 Item 4C - Contract - 2019 Annual Small Drainage Program with KPG Inc for $78,984
COT-City
>
City Clerk
>
Council Agenda Packets
>
2019 Council Agenda Packets
>
2019-04-01 Regular
>
Reg 2019-04-01 Item 4C - Contract - 2019 Annual Small Drainage Program with KPG Inc for $78,984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 4:52:09 PM
Creation date
3/28/2019 4:52:05 PM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
04/01/19
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Allan Ekberg, Mayor <br />Public Works Department - Henry Hash, Director <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation and Infrastructure Committee <br />FROM: Henry Hash, Public Works Director /I <br />BY: Ryan Larson, Senior Program Manager <br />CC: Mayor Allan Ekberg <br />DATE: March 15, 2019 <br />SUBJECT: Surface Water Fund - 2019 Annual Small Drainage Program <br />Project No. 91941201 <br />Design Consultant Selection and Agreement <br />ISSUE <br />Approve the contract with KPG, Inc. (KPG) to design the 2019 Annual Small Drainage Program. <br />BACKGROUND <br />The Annual Small Drainage Program repairs and installs needed surface water infrastructure that is <br />identified through maintenance activities as well as citizen complaints. For the 2019 Annual Small <br />Drainage Program, staff is proposing the design of eight projects for possible construction in 2019. <br />DISCUSSION <br />The current MRSC Consultant Roster was reviewed and three firms were short-listed to provide design <br />services. The firms were: KPG; Otak, and PACE Engineers Inc. The Summary of Qualifications were <br />evaluated from each firm and KPG was selected as the firm that best met the requirements. KPG has <br />designed the Annual Small Drainage Program since 1991 and Public Works continues to be very <br />satisfied with their work. KPG also worked on the 2018 Annual Small Drainage Program and is <br />knowledgeable of the sites. <br />Public Works staff reviewed the list of known system deficiencies and compiled a list of eight projects <br />for design in 2019. One of the projects was substantially designed in 2017, but not constructed due to <br />budget constraints. The design projects are: <br />1. Gilliam Creek & S 154th St Drainage Structure 5. S 140th St at 38th Ave S (pipe lining) <br />2. 14811 42nd Ave S 6. S 152nd St at 42nd Ave S (pipe lining) <br />3. Stairs at Gilliam Creek Control Structure 7. S 130th St at 33rd PI S (pipe lining) <br />(finish design) 8. 40th Ave S at Southcenter Blvd (pipe lining) <br />4. Southcenter Blvd at 61st Ave S (pipe lining) <br />FINANCIAL IMPACT <br />KPG's proposed fee for the 2019 Small Drainage Program's design contract is $78,984.00 and the <br />2019 design budget is $80,000. <br />RECOMMENDATION <br />Council is being asked to approve the design consultant agreement with KPG, Inc. in the amount of <br />$78,984.00 for the 2019 Small Drainage Program and consider this item on the Consent Agenda at the <br />April 1, 2019 Regular Meeting. <br />ATTACHMENTS <br />• Qualification Review <br />• Page 88, 2019 CIP <br />• KPG Consultant Agreement <br />W:1PW Eng1PROJECTSIA- DR Projects\Annual Small Drainage Programs12019 SDP (91841201)1Consultant Seleclionllnfo Memo Design 2019 SDP.docx <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.