City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-04-16 Item 2C - Handout Distributed at Meeting - 1989-2019 Tukwila Hill Projects and Expenditures
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-04-16 Transportation and Infrastructure
>
TIC 2019-04-16 Item 2C - Handout Distributed at Meeting - 1989-2019 Tukwila Hill Projects and Expenditures
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:16 PM
Creation date
4/23/2019 11:44:09 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/16/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tukwila Hill Projects and Expenditures 1989 - 2019 <br />1990 <br />1991 <br />1999 <br />2000 <br />2000 <br />2000 <br />2001 <br />2001 <br />2002 <br />2002 <br />1989-2003 <br />2003-2015 <br />2004-2007 <br />2007 <br />2008 <br />2012 <br />2017 <br />2005-2017 <br />North Hill Reservoir and Pump Station - 57th Ave S <br />S 150th St (Macadam Rd to 55th Ave S) <br />1999 Small Drainage Program - 53rd Ave S Drainage Improvements <br />2000 Small Drainage Program - 58th Ave S/59th Ave S Alley <br />2000 Small Drainage Program - 56th Ave S/ S 147th St <br />2000 Small Drainage Program - 53rd Ave S/S 139th St <br />2001 Small Drainage Program - Macadam Road Stairs <br />2001 Small Drainage Program - S 138th St <br />2002 Small Drainage Program - 57th Ave S <br />2002 Small Drainage Program - 65th Ave S <br />Interurban Ave S Bridge Widening & Trail Bridge <br />Fort Dent Park (from CIP Park page, 32) <br />Macadam Winter Garden <br />2007 Small Drainage Program <br />2008 Small Drainage Program <br />2012 Small Drainage Program <br />2017 Small Drainage Program <br />- 65th Ave S <br />- S 149th St & S 150th St <br />- S142ndSt <br />- 58th Ave S <br />Interurban Ave S (S 144rd St to Fort Dent) <br />2018 2018 Overlay & Repair - Southcenter Blvd <br />2018 Grady Way Bridge Seismic Repairs <br />2015-2019 53rd Ave S Road, Water, Sewer, & SWM <br />$ 3,800,000 <br />8710301 <br />15,000 <br />150,000 <br />15,000 <br />15,000 <br />15,000 <br />25,000 <br />15,000 <br />25,000 <br />1,887,000 <br />2,017,000 <br />424,000 <br />20,000 <br />175,000 <br />75,000 <br />104,000 <br />12,934,588 <br />750,000 <br />354,214 <br />9,250,000 2019 Budget <br />$ 32,065,802 <br />W:\9hared Copy Only \GaII\Nelghborhood Projects 1989-2019 g1030619.x1sx <br />
The URL can be used to link to this page
Your browser does not support the video tag.