City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Reg 2019-05-06 Item 4C - Final Acceptance - 2018 Commerical Business District Sewer Rehabilitation with Michels Corporation for $411,460.27
COT-City
>
City Clerk
>
Council Agenda Packets
>
2019 Council Agenda Packets
>
2019-05-06 Regular
>
Reg 2019-05-06 Item 4C - Final Acceptance - 2018 Commerical Business District Sewer Rehabilitation with Michels Corporation for $411,460.27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 11:58:07 AM
Creation date
5/2/2019 11:58:04 AM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
05/06/19
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Allan Ekberg, Mayor <br />Public Works Department - Henry Hash, Director <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation & Infrastructure Committee <br />FROM: Henry Hash, Public Works Director 0/ <br />BY: Michael Ronda, PW Project Manager <br />CC: Mayor Ekberg <br />DATE: April 12, 2019 <br />SUBJECT: CBD Sanitary Sewer Rehabilitation — 2018 Construction <br />Project No. 91140203, Contract No. 18-040 <br />Project Completion and Acceptance <br />ISSUE <br />Accept the construction contract as complete and authorize release of retainage. <br />BACKGROUND <br />The Notice to Proceed for Contract No. 18-040 with Michels Corporation of Salem, Oregon was <br />issued on April 30, 2018, for the 2018 CBD Sanitary Sewer Rehabilitation Project. This construction <br />project installed approximately 3,660 lineal feet of cured -in -place pipe within the right-of-way of <br />Andover Park West, Tukwila Parkway, Baker Boulevard and private easements in order to <br />rehabilitate existing sewer pipes. <br />DISCUSSION <br />Construction was physically completed on January 15, 2019. The extended time for the contract was <br />due to a short section of failed liner that had to be removed and replaced. Two change orders were <br />executed during the project and several sections of sewer pipe lining were deleted from the contract. <br />FINANCIAL IMPACT <br />The construction budget for the 2018 CBD Sewer Rehabilitation Project was $539,559.90, with a 20% <br />contingency of $89,926.65, which was not used. Underruns were mainly due to work deleted from the <br />contract due to various conflicts that would not allow the relining to be performed at this time. <br />Retainage of $18,702.74 is currently being held. <br />Construction Contract Amount (w/tax) <br />Change Order Nos. 1 & 2 <br />Contract Under -runs <br />Total Contract Amount <br />Expenses <br />$449,633.25 <br />7,393.09 <br />($45,566.07) <br />$411,460.27 <br />RECOMMENDATION <br />Council is being asked to formally accept the 2018 CBD Sanitary Sewer Rehabilitation Project with <br />Michels Corporation in the amount of $411,460.27 as complete, and authorize the release of the <br />retainage, subject to standard claim and lien release procedures, and consider this item on the <br />Consent Agenda at the May 6, 2019 Regular Council Meeting. <br />ATTACHMENT <br />Notice of Completion, Contract #18-040 <br />W:\PW Eng\PROJECTS\A- SW Projects\CBD Sewer Rehab (91140203)\2018 CBD Sewer -Relining \ Construction \#.700 - Post Construction & Closeout\Info Memo - 2018 CBD Sewer <br />Rehab Final Acceptance - 05-06-2019.doc <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.