EXHIBIT 1 <br />The S. 180th St. Bridge Floodwall was originally constructed incorrectly and angles down under the S. 180th <br />St. Bridge. This leaves a gap in flood protection and may lead to flooding of the Tukwila Urban <br />Center. Project will extend an existing flood wall vertically and tie it into the roadway bridge abutment at <br />the S. 180th St. Bridge Floodwall to provide 100-year flood protection. The project will correct this <br />deficiency. <br />Budget: <br />Design Engineering $ 9,000 <br />Construction Engineering $12,378 <br />Construction $44,000 <br />Total $65,378 <br />8 <br />